NORTH / 30kg. Mill City Roasters, LLC rd Ave SE Minneapolis, MN 55414

Similar documents
NORTH / 1kg. Mill City Roasters, LLC rd Ave SE Minneapolis, MN 55414

NORTH / 1KG. Mill City Roasters, LLC rd Ave SE Minneapolis, MN 55414

NORTH / 2KG. Mill City Roasters, LLC rd Ave SE Minneapolis, MN 55414

BC ROASTERS LINEUP. The Commercial Coffee Roasters. BuckeyeCoffee.com

TKMSX-15 COFFEE ROASTER

BC Gold Standard Lineup!

RG4 AND RG7 INSTALLTION AND MAINTENANCE

INSTALLATION AND OPERATION MANUAL FOR GAS TILTING BRAISING PANS MODELS G30TB & G40TB

TKMSX 15 COFFEE ROASTING MACHINE

IMPORTANT: READ THESE INSTRUCTIONS CAREFULLY BEFORE STARTING INSTALLATION OR USE. WARNINGS AND SAFETY CODES

BULL. ASSEMBLY & OPERATING INSTRUCTIONS

OPERATING MANUAL. Sample PRO 100 Series. Electric Heating. Applies to Versions: SPE1*, SPE2, SPE4, SPE6

CAFEMINO GAS TKMSX-1 COFFEE ROASTER

A951A/S PRODUCT SPECIFICATIONS SINGLE STAGE GAS FURNACE CONTROLS VENTING INSTALLATION FEATURES WARRANTY CONFIGURATIONS HEAT EXCHANGER DESIGN BURNER

OWNERS MANUAL. Installation, Operation & Maintenance Guide MODELS: SO30BQRRL/SO42BQRL

TKMSX 5 COFFEE ROASTING MACHINE

Folding Grill Stand Manual

USER MANUAL SSSSSSSSSSSS SSSSSSSSSSSS SSSSSSSSSSSS SSSSSSSSSSSS SSSSSSSSSSSS SSSSSSSSSSSS SSSSSSSSSSSS SSSSSSSSSSSS SSSSSSSSSSSS SSSSSSSSSSSS BSC01

BLT-E ELECTRIC FLOOR MODEL BRAISING PAN WITH MANUAL TILT INSTALLATION OPERATION MAINTENANCE

14 ROUND TABLETOP GAS GRILL. Product code: UPC code: Date of purchase: / /

ARIZONA COFFEE ROASTERS


PRODUCT CATALOG EDITION 1 COMMERCIAL COOKING EQUIPMENT

The S marter W ay to Roast

ASSEMBLY & OPERATION INSTRUCTIONS FOR OUTDOOR GAS BARBECUES

STAINLESS STEEL GAS BARBECUE MODEL NO: SSBBQ4 USER GUIDE PART NO: /11

GAS BARBECUE MODEL NO: BBQ4 USER GUIDE PART NO: /11

Gravity Feed Commercial BBQ Smoker

Installation & Parts Manual 2" & 3" High Capacity Strainers For Class 1, Petroleum Applications

18-Bottle Dual Zone Slimline Edition Touchscreen Refrigerator

VCS325SSBI Series and VCS525SSBI Series Assembly Procedures

Crave Series. direct vent gas fireplaces

Cutout Width 28 5/8 28 5/8 40 1/4 40 1/4 (72.7 cm) (72.7 cm) (102.2 cm) (102.2 cm)

INSTALLATION & OPERATION MANUAL

OWNER S MANUAL. Cabo. Adventurer Series Gas Grill Model A10-703

Contents. Fittings and parts checklist

Product Presentation. C-series Rack Ovens

SECTION MANUFACTURED GAS FIREPLACES

Installation Instructions Built-In Coffee Maker

Outdoor Grills and Modules

Shotmeister Owner s Manual. The Sleekest Design, Pouring the Coldest Shots

Matic / THa. Operating instructions COFFEE BREWER. Mode d emploi MACHINE À CAFÉ. Gebrauchsanleitung KAFFEEBRÜHMASCHINE

IR Series (IR-1, IR-2.5, IR-5, & IR-12) Installation & Operation Manual

OMEGA PRODUCTS, INC LYSTER LANE HARRISBURG, PA U.S.A. PHONE: FAX:

Installation and User Instructions Flushing System Kit

288 MODEL BICM24CS SHOWN WITH WD30EP WARMING DRAWER

Important: Retain these instructions for future use.

Introducing 2012 Vermont Castings Signature Series Grills. Premium craftsmanship. precision cooking.

ATTIAS OVEN CORPORATION (COMMERCIAL BBQ ROTISSERIES)

Creates evenly distributed extreme high heat to the cooking surface, and consists of stainless burners.

Built in Electric Fan Oven

INSTALLATION AND SPECIFICATION MANUAL

" Table Top Charcoal Grill Model # SRYH1450 Instructions Manual

INSTALLATION MANUAL TG - ROTISSERIE OVEN MODELS

24-Bottle 2-Temp Touchscreen Refrigerator

BakerBox multi-purpose pizza oven

CHARCOAL SERIES EXPERTS IN GAS & INFRARED GRILLING. napoleongrills.com.au

DO STEAK JUSTICE. LEX SERIES LEX SERIES. napoleongrills.com

AS450, AS600, G1, SG630

Universal Ignitor Upgrade Kit

KAMADO JOE GASJOE THE NEXT REVOLUTION IN GRILLING. Shown: GasJoe 38. GasJoe Specifications

DO STEAK JUSTICE. LEX SERIES napoleongrills.com

Platinum BBQ Series. 4 burner - BQ burner - BQ 1011

FORM NO. ATZ-221 Supersedes Form No. ATZ-210 AIR CONDITIONERS

OWNER S MANUAL GRAVITY FEED MODELS FOR OUTDOOR USE ONLY WARNING DO NOT STORE OR USE COMBUSTIBLE MATERIALS NEAR THIS UNIT

Assembly Procedures VCS322SSBI Series / VCS522SSBI Series

BLG-E ELECTRIC FLOOR MODEL BRAISING PAN WITH MANUAL GEARBOX TILT INSTALLATION OPERATION MAINTENANCE

BUILT IN DELUXE SPIT BRAAI MODELS: 1200 & 1500

MODEL# GCG165 COFFEE GRINDER. PHOTO OF PRODUCT

Assembly Instructions & User s Manual TRITON 6 BURNER GRIDDLE Model #: FSODBG1206

POWERED BY NITRO COLD BREW COFFEE FULL EQUIPMENT LINE

41 North View Drive, Sunshine West, VIC 3020 Phone:

JUMBUCK RONDO MEDIUM CHARCOAL SPIT ROASTER (HS-FP002)

CPF48UGMX New product

LOT: PO: 4098_GelCanInsert_JW_ Model # oz Gel Fuel Can Firebox Insert

illuminating possibilities FEATURING i-glow BACKLIT TECHNOLOGY By Napoleon

48-Bottle Dual Zone Silent Wine Refrigerator

The Sedona Elite 3200 Old World Charm Meets New World Technology

Manual Spark Ignition (MSI) Kit For Use only with Thermocouple Manual Safety (TMSI) UL Approved Fire Pit Pans with Burning Spur

Adventurer Barbecue G2727

Speed Pour Owner s Manual. Serving up the Coldest Shots

INSTRUCTION BOOK CARE & USE/INSTALLATION

Strainers In-Line and Angle

THE NEW GENERATION OF OVENS

30" Gas Self-Clean GSCR " SELF-CLEAN OVEN FEATURES (continued) 30" RANGE-TOP FEATURES OVEN MODES 30" SELF-CLEAN OVEN FEATURES OTHER OVEN USES

左边 :SAFTY NOTES 右边 : Please follow the safety precautions to avoid any harm to yourself and cause any damages Never Always Warning Attention

TOASTER OVEN USER MANUAL MODEL: PKMFT039

HORIZON BARBECUE ROASTING HOOD OWNERS MANUAL

MCS Ovens. Member of the

Pavilion 14,9 m2 health, beauty, peace of mind

TMT TC TMA. SILVER Multi-deck steam tube tunnel oven. SILVER Cyclotherm tunnel oven. SILVER Multi-deck convection tunnel oven

Pneumatic Cylinders Cartridge Cylinders Series P1G

12 Bottle Dual Zone. Touchscreen INSTRUCTION MANUAL

Portable Charcoal Grill

30" Manual Clean GCR " OVEN FEATURES (continued) 30" RANGE-TOP FEATURES OVEN MODES 30" OVEN FEATURES OTHER OVEN USES

for Assembly, Operating & Maintenance of THIS CHARCOAL GRILL IS DESIGNED FOR OUTDOOR USE ONLY.

CPF48UGMYW New product

DELUXE CLASSIC SERIES OUTDOOR GAS BARBECUE 42,000 BTU

Deluxe Caterer BBQ Series

Pavilion 9,2 m2 health, beauty, peace of mind

Transcription:

NORTH / 30kg Mill City Roasters, LLC. 1050 33rd Ave SE Minneapolis, MN 55414 Phone: +1 (612) 886-2089 Email: sales@millcityroasters.com Online: www.millcityroasters.com PART ONE 1

! Note: Owner must post in a prominent location instructions to be followed in the event the operator smells gas or otherwise detects a gas leak. These instructions shall be obtained by consulting the local gas company or gas supplier.! FOR YOUR SAFETY Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance.! WARNING Improper installation, adjustment, alteration, service or maintenance can cause property damage, injury or death. Read the installation, operating and maintenance instructions thoroughly before installing or servicing this equipment.! Note: This manual shall be retained for future reference. 2 PART ONE July 26, 2018

MILL CITY ROASTERS GRAPHICAL GUIDE SERIES 2018 Mill City Roasters, LLC. PART ONE 3

TABLE OF CONTENTS PART ONE ROASTER SPECIFICATIONS 5 MACHINE OVERVIEW 7 SPACE PLANNING 14 VENTING 16 GAS & ELECTRICAL 22 PART TWO GAS INSTALLATION ELECTRICAL INSTALLATION PHIDGET WIRING CONTROL PANEL OVERVIEW TEMPERATURE SETTINGS ARTISAN SET UP TORQUE LIMITER ADJUSTMENT PART THREE ROASTER SAFETY ROASTER IGNITION SEASONING ROASTS CLEANING & MAINTENANCE WARRANTY TECHNICAL SUPPORT 4 PART ONE

30KG GAS COFFEE ROASTER Model: NC-030 Nominal Capacity: 30 Kilograms Mill City Roasters, Minneapolis, MN, USA Assembled by North Coffee Roaster Co., LTD, Shenzen, China PART ONE 5

ROASTER SPECIFICATIONS Dimensions Roaster Size (length x width x height) Roaster Weight Chaff Collector Size (diameter x height) Chaff Collector Weight Cooling Fan Size (length x width x height) Cooling Fan Weight Drum Construction Drum Size (diameter x length) Cooling Tray Size (diameter) Capacity/Output Batch Size Average Roasting Time Production Power Roaster Drum Motor Exhaust Fan Motor Cooling Fan Motor Cooling Tray Stirring Motor Gas Fuel Type 109 x 54 x 104 in (2779 x 1370 x 2644 mm) 3,060 lb (1388 kg) 27.5 x 78.25 in (700 x 1988 mm) 200 lb (90.72 kg) 18.25 x 22 x 26.5 in (463 x 558 x 673 mm) 90 lb (40 kg) Double-walled Drum, 430 Stainless Steel, Welded 39.5 x 35.75 in (1002 x 910 mm) 47.5 in (1206 mm) 5-30 kg < 15 minutes 198 lb/hr, 1584 lb/day (90 kg/hr, 720 kg/day) Three Phase 220V, 20A, 50-60Hz 1500W 750W 2200W 750W Max BTU 205,000 Burner Control Gas Connection Gas Pressure Required Gas Orifice S Max Gas Usage LP Gas -or- Natural Gas Manual Valve 1/2 NPT LP Gas: 16 of water column Natural Gas: 16 of water column LP Gas: 0.7 mm (installed at factory) Natural: 0.9 mm (see conversion/installation instructions) 6.17 lb/hr (2.8 kg/hr) Exhaust Typical Roaster Exhaust High Temp 400 F - 450 F Typical Chaff Collector Exhaust High Temp 300 F Typical Cooling Tray Exhaust High Temp 180 F Max Exhaust Exhaust Venting Type Required 1935 CFM Class III, Positive Pressure Data Logging USB Logging Interface Phidget 1048 Logging Thermocouples BT, ET, Incoming Air 6 PART ONE

MACHINE OVERVIEW VISUAL GUIDE TO ROASTER, CHAFF COLLECTOR & COOLING FAN ROASTER - TOP VIEW PART ONE 7

8 PART ONE ROASTER - FRONT

ROASTER - LEFT SIDE (CONTROL PANEL SIDE) PART ONE 9

Updated 2018 image coming soon. Contact us for more information. ROASTER - REAR 10 PART ONE

ROASTER - RIGHT SIDE PART ONE 11

TOP SIDE CHAFF COLLECTOR 12 PART ONE

TOP SIDE SIDE COOLING FAN PART ONE 13

SPACE PLANNING CONSIDERATIONS WHEN PLACING YOUR ROASTER The SPACE PLANING portion of this guide references the three free-standing components included in this model (Roaster, Chaff Collector, Cooling Fan), the venting connections between those components along with suggestions for venting your system to termination (typically outdoors). Beyond these components, users will likely require space for their own set-up during the roasting process including containers for green coffee and roasted coffee, stand/desk for a laptop, stools, work table, vacuum for removing chaff from chaff collector, scale, etc. When referencing the minimum space requirements we suggest, please adjust as needed for your own roasting process. On the next page is a suggested layout of the Roaster, Chaff Collector and Cooling Fan. Although other layouts are workable, this option is derived by prioritizing the following variables: (1) connecting the exhaust of the Cooling Fan with the main exhaust flue above/beyond the Chaff Collector to prevent multiple penetrations in your roof/walls, (2) avoiding sharp bends/angles in all the vent lines to promote good air flow and cleaner vents by spreading equipment apart, and (3) providing clearance, access and reachability to different parts of the equipment that are required for safe operation. The venting diagrams and specified venting parts in the pages beyond are based on this arrangment. Deviations from this arrangement due to space constrainst will require modification of those specifications. Please contact Mill City Roasters if you require assistance in customizing your layout in your space. sides and rear of all parts of the roaster, chaff colllector and venting for easy access and proper maintainance. 3. Maintain 18 clearance to combustibles. 4. The intake port on the Chaff Collector shall be within 12-60 of the exhaust port on the Roaster (typically at the rear) with minimal angles in the venting connecting the two ports. 5. The intake port of the Cooling Fan should be within 48 of the exaust port on the Cooling Tray with minimal angles in the venting connecting the two ports 6. Chaff Collector Access: Maintain access to doors of chaff collector and clearance to allow for easy (and frequent) removal of chaff. 7. Blast Gate: When connecting the exhaust of the Cooling Fan to the exhaust flue above/beyond the Chaff Collectior, we suggest using a blast gate in that venting line. This prevents back flow of roast exhaust into the fan. This will require the user to open the blast gate when the Cooling Fan is in use and should be within reach from the left side of the roaster and Control Panel. 8. We suggest venting components have Quick Release features to allow for venting to be removed for cleaning and to provide clear access to the roaster interior and motors as required for maintenance. Space Planning Guidelines 1. Check your local municiple building code for regulations regarding the placement and venting of combustible production machinery. The requirements of your local authorities will govern in the event they exceed or contradict the recommendations made in this guide. 2. We recommend maintaining 24 clearance at 14 PART ONE

SUGGESTED SPACE PLAN - TOP VIEW PART ONE 15

VENTING PORTS, PARTS & LINES Port/Vent Line Information: Port Location Nominal Diameter Length Roaster Exhaust Cooling Tray Exhaust Chaff Collector Intake Chaff Collector Exhaust Cooling Fan Intake Cooling Fan Exhaust *Port diameter & length may vary. Field verification is highly suggested. Venting Notes: Commercial Coffee Roasters have specific requirements for venting. Combustion gases, steam, smoke, condensed coffee oils are power vented via an exhaust fan creating pressure in the pipe is higher than normal atmosphere. This is called a Positive Pressure system and requires venting that accomodates not only this pressure but the heat the venting carries. RECOMMENDED: To connect your components, we suggest a single-wall, Class III positive presure venting (such as Nordfab QF Venting or simliar) as it meets positive pressure requirements, and easily disassembles without tools. Ability to quickly disassemble makes maintenance easier, installation cleaner and safer. Once components are connected but before your venting begins to interact with your building envelope (both being in proximity to and/or penetration building finishes and materials), we suggest shifting to double-wall, Class III positive presure venting (such as double-wall systems offered by Selkirk or Duravent or similar). Layouts should be designed to provide access to all portions of the exhaust system and allow for weekly/monthly cleaning/cleaning/sweeping. Follow all applicable building and mechanical codes. NOT RECOMMENDED: Please note, attempting to use a negative pressure venting system like Class B or L or A venting, or stovepipe (typical venting found at the local hardware store) is not recommended as those systems will require each individual joint to be sealed to accomodated the pressurized system. Sealing joints makes cleaning more difficult so proper cleaning is often less frequent than required to maintain safe operation. Flex duct of any rating is not suggested due to its ribbed surface which collects debris and is more difficult to clean. Coffee dust, condensed coffee oil and chaff accumulation can cause fires in the chaff collector and venting. If you have a chaff fire or a fire in your venting line, that light and inexpensive venting will likely not be rated to contain that fire and you may see significant property damage and injury. Contact Mill City Roasters fo more information on venting kits and venting design services. 16 PART ONE

SUGGESTED VENTING DIAGRAM - TOP VIEW SCALE 1/2 = 1-0 Note: Venting is not included with the purchase of your roaster but the layout shown above is a venting kit available from Mill City Roasters that will connect your Roaster to your Chaff Collector and then provide a starting point above the chaff collector from which your HVAC professional can work to finish your connection to termination outdoors PART ONE 17

SUGGESTED VENTING DIAGRAM - LEFT SIDE Note: Venting is not included with the purchase of your roaster but the layout shown above is a venting kit available from Mill City Roasters that will connect your Roaster to your Chaff Collector and then provide a starting point above the chaff collector from which your HVAC professional can work to finish your connection to termination outdoors 18 PART ONE

SUGGESTED VENTING DIAGRAM - RIGHT SIDE Note: Venting is not included with the purchase of your roaster but the layout shown above is a venting kit available from Mill City Roasters that will connect your Roaster to your Chaff Collector and then provide a starting point above the chaff collector from which your HVAC professional can work to finish your connection to termination outdoors PART ONE 19

SUGGESTED VENTING DIAGRAM - FAN & CHAFF COLLECTOR Note: Venting is not included with the purchase of your roaster but the layout shown above is a venting kit available from Mill City Roasters that will connect your Roaster to your Chaff Collector and then provide a starting point above the chaff collector from which your HVAC professional can work to finish your connection to termination outdoors 20 PART ONE

VENTING BRANCH DETAIL CONNECTING COOLING FAN EXHAUST TO MAIN EXHAUST/FLUE ABOVE CHAFF COLLECTOR PART ONE 21

This concludes Part I: Planning of the Graphical Guide for this roaster. If you have further questions or require customized assistance with your planning, contact us. Mill City Roasters, LLC. 1050 33rd Ave SE Minneapolis, MN 55414 Phone: +1 (612) 886-2089 Email: sales@millcityroasters.com Online: www.millcityroasters.com 22 PART ONE