Implementation Status & Results Vietnam System Efficiency Improvement, Equitization & Renewables Project (P066396)

Similar documents
Implementation Status & Results Vietnam System Efficiency Improvement, Equitization & Renewables Project (P066396)

Implementation Status & Results Vietnam Second Rural Energy Project (P074688)

Implementation Status & Results Vietnam Second Rural Energy Project (P074688)

Implementation Status & Results Vietnam Natural Disaster Risk Management Project (P073361)

DANH SÁCH THÍ SINH DỰ THI IC3 IC3 REGISTRATION FORM

WINE & DINE OFFERS. Merchant Offer Photo Validity Outlet. 5% off total bill Til 01/10/2017

WINE & DINE OFFERS. Merchant Offer Photo Validity Outlet

Countries» Sourcing From Guides» About» Contact us

Explore the hidden charm of Vietnam. With merchant privileges powered by Visa

Vietnamese Song Booklet

PREMIER VILLAGE PHU QUOC RESORT

The W Gourmet mooncake gift sets are presently available at:

ART OF CEILINGS. Classic ceilings dry walls

Places to eat in Westminster, CA

INTRODUCTION OF MATERIAL SOURCES DAKLAK CHEER FARM

GCFood Brand Overview Video

REHABILITATION AND CONSERVATION OF NYAPALMS

Viet Deli Today MENU. Hanoian grilled. Deep fried crispy pork belly. and aroma salsa. - Gillian Anderson -

Proposed amendments. Third meeting of the Working Group on the Trans-Asian Railway. Document E/ESCAP/TARN/WG(3)/2.

29/07/2012. Phisyco-chemical properties and current postharvest practices on main fruits varieties in the South of Vietnam

VIETNAM COFFEE MARKET REPORT Q1/2018

Các bước trong phân khúc thi truờng. Chương 3Phân khúc thị trường. TS Nguyễn Minh Đức. Market Positioning. Market Targeting. Market Segmentation

Bài 15: Bàn Thảo Chuyến Du Ngoạn - cách gợi ý; dùng từ on và happening

HANDICRAFT AND AGRICULTUAL DISTRIBUTOR

Preface Introduction reference for trainers We want your help

Tour dates for BUCKWHEAT FLOWER SEASON

REPORT. Scoping study on commercial vegetable production in Son La and Dien Bien. FOR THE PROJECT ENTITLED HUMIDTROPICS, A CGIAR RESEARCH PROGRAM

VIETNAM AND THE EFFECT OF COMPACT FLUORESCENT LAMP AS A REPELLENT

Discovery Indochina Your Way!

NATIVE ADS. Apply from 01/03/2017 to 31/12/2017

Survey and Information Collection on Surimi Industry and catch data in Vietnam, June 2006

VIETNAM VEGETABLE AND FRUITS

VIETNAM COFFEE MARKET REPORT Q1/2018

LEARN. SHARE. NETWORK TEA SUPPLY CHAIN

COMBINATION MEALS. (No substitutions please) NO. 4 $18

The Hanoi. Your Favorite Traditional Vietnamese Cuisine in Sydney OPEN 7 DAYS. Mon Sat: 11 am - 9 pm, Sunday: 4 pm - 9 pm

Beef Rice Noodle Soup -Pho-

Terms of Reference for Consultant. Scoping Study on Potential for development of Pro-Poor Value Chains for Shan Tuyet Tea in Northern Vietnam

CHƯƠNG I. TỔNG QUAN VỀ HỆ THỐNG DCS- CENTUM CS 3000

Coffee Supply Chain IN VIETNAM

VIETNAMESE COFFEE REPORT

PLASTIC & PACKAGING. Production Trading Exporting.

Bottle Feeding Your Baby

PHÂN TÍCH DIỄN BIẾN LƯU LƯỢNG VÀ MỰC NƯỚC SÔNG HỒNG MÙA KIỆT

KHAI VỊ - APPETIZERS PHỞ BÒ BEEF NOODLE SOUP

FREQUENTLY ASKED QUESTIONS (FAQS)

Can fruit revitalize HAG?

2. The proposal has been sent to the Virtual Screening Committee (VSC) for evaluation and will be examined by the Executive Board in September 2008.

City Stay Vietnam. Saigon Half Day Ho Chi Minh City Walking Tour. Inclusions of City Stay. Half Day in the Life of Chinatown. Half Day Cyclo City Tour

Xác định phân bố không gian của các hằng số điều hòa thủy triều tại vùng biển vịnh Bắc Bộ

TAN VETERAN DAVE SABBEN MG

KHAI VI - APPETIZERS. BO LA LOT (3 pcs): Grilled marinated beef and pork wrapped in an aromatic Hawaiian leaf.

ITINERARY (As at 12 September 2017)

SUSTAINABLE COFFEE PROGRAM Vietnam February 2014

Tiến tới hoàn thiện và triển khai hệ thống mô hình giám sát, dự báo và cảnh báo biển Việt Nam

Shrimp & Pork Rolls (2 Rolls) - Rice Flour crepes /w. Vietnamese f ried Rice Flour crepes /w Bean Sprouts, Onion, Shrimp, and Pork

Model SMB Lưỡi dao, bộ phận cảm biến nhiệt và lòng bình bằng thép không gỉ 304 an toàn cho sức khỏe.

ABSTRACT VẬT LIỆU VÀ PHƯƠNG PHÁP NGHIÊN CỨU. Vật liệu nghiên cứu

DEMAND TREND, MARKET, PRICE DEVELOPMENT AND PROMOTIONAL REQUIREMENTS FOR DRAGON FRUIT

CHẤT LƯỢNG MÔI TRƯỜNG NƯỚC BIỂN VEN BỜ ĐẢO PHÚ QUỐC

Parameters Effecting on Head Brown Rice Recovery and Energy Consumption of Rubber Roll and Stone Disk Dehusking

EFFECT OF PACKAGING TO QUALITY AND SHELF-LIFE OF FRESH SEA GRAPES (CAULERPA LENTILLIFERA J.AGARDH, 1837)

Native Women Overprints

CÀI ĐẶT MẠNG CHO MÁY IN LBP 3500 và LBP 5000

REPORT ON PEPPERCORN SECTOR IN VIETNAM

Savor Mid-Autumn Treasures at Hilton Hanoi Opera! Gìn giữ nét đẹp cổ truyền

NGHIÊN CỨU ĐẶC ĐIỂM BIẾN ĐỘNG DÒNG CHẢY VÙNG VEN BIỂN HẢI PHÒNG

PHÁT TRIỂN ỨNG DỤNG WEB

Tôm càng chiên, rau xà lách romaine, hạt thông, xốt giấm đen. Đầu mực nướng, sữa chua hương cumin, xà lách trộn

Places to eat in Garden Grove, CA

Pepper Crop Report 2017

STARTERS - MÓN KHAI VỊ SALADS - GỎI SOUPS - SÚP (N) (N) (N) Nem chiên cuốn tôm nấm (N) (P) (P) (N)

We hope you enjoy our food and hospitality,

1) What proportion of the districts has written policies regarding vending or a la carte foods?

INITIAL PUBLIC OFFERING OF SHARES THE VIETNAM NATIONAL TEA CORPORATION

LIST OF MERCHANTS (PLATINUM & PREMIUM PROGRAM)

A1. SPRING ROLLS PORK / CHICKEN / PRAWN (8 ROLLS) 8.50

Draft Document: Not for Distribution SUSTAINABLE COFFEE PARTNERSHIP: OUTLINE OF STRUCTURE AND APPROACH

ED 1957/05. 1 July 2005 Original: English. Development of and prospects for the Vietnamese coffee industry

March 2-4, 2016 Vung Tau City, Vietnam MODULE 3: EDUCATION LEADERS INNOVATION FORUM (ELIF) - FORUM 2

Smart Specialisation Strategy for REMTh: setting priorities

FOOD MENU FOR M ORE IN FO, N EWS A N D OFFERS FOLLOW U S ON /M IEN TAY RES TAU RA N IEN _TAY

SUGGESTED RESTAURANT

Networkers Business Update. December 2014

GREEN SUPPLY CHAIN UNILEVER RAM BHADOURIA UNILEVER.

1-5/34 Wright Street, Ferryden Park, SA maikitchen.com.au

Financial Results for Fiscal Year Ended December 31, 2018 February 14, 2019 Suntory Beverage & Food Limited

Lunch Menu. By Executive Chef Pescarolo. Executive Sous Chef Hung

Economic Role of Maize in Thailand

ĐÁNH GIÁ HIỆU QUẢ XỬ LÝ NƯỚC THẢI CHĂN NUÔI LỢN BẰNG HẦM BIOGAS QUY MÔ HỘ GIA ĐÌNH Ở THỪA THIÊN HUẾ

BÀI TẬP DỰ ÁN ĐÂU TƯ (Học kỳ 3. Năm )

CỘNG HÒA XÃ HỘI CHỦ NGHĨA VIỆT NAM QCVN 4-1: 2010/BYT QUY CHUẨN KỸ THUẬT QUỐC GIA VỀ PHỤ GIA THỰC PHẨM - CHẤT ĐIỀU VỊ

X-MAS GIFT 2017 // THE BODY SHOP

PHÂN PHỐI CHUẨN. TS Nguyen Ngoc Rang; Website: bvag.com.vn; trang:1

Ths. Nguyễn Tăng Thanh Bình, Tomohide Takeyama, Masaki Kitazume

NHỊP ĐẬP THỊ TRƯỜNG QUÝ 3, 2015

TRIỂN VỌNG CỦA NGÀNH MÍA ĐƯỜNG, NHIÊN LIỆU SINH HỌC VÀ CÁC VẤN ĐỀ VỀ KỸ THUẬT TRỒNG MÍA

For personal use only

Current Status of Asian Elephants in Vietnam

Ergon Energy Corporation Limited 21 July 2010

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Vietnam System Efficiency Improvement, Equitization & Renewables Project (P066396) Operation Name: System Efficiency Improvement, Equitization & Renewables Project Stage: Implementation Seq.No: 14 Status: ARCHIVED Archive : 17-Jan-2013 Project (P066396) Country: Vietnam Approval FY: 2002 Product Line: IBRD/IDA Region: EAST ASIA AND PACIFIC Lending Instrument: Specific Investment Loan Implementing Agency(ies): Key s Board Approval 25-Jun-2002 Original Closing 31-Dec-2007 Planned Mid Term Review Last Archived ISR 11-May-2012 Effectiveness 19-Feb-2003 Revised Closing 31-Dec-2012 Actual Mid Term Review Project Development Objectives System Efficiency Improvement, Equitization & Renewables Project (P066396) Project Development Objective (from Project Appraisal Document) No change to PDO following restructuring. Has the Project Development Objective been changed since Board Approval of the Program? Yes No losure Authorized Public Disclosure Authorized System Efficiency Improvement, Equitization & Renewables Project (GEF Renewable Component) (P073778) Global Environmental Objective (from Project Appraisal Document) Promote renewable energy by removing barriers and reducing implementation costs Has the Global Environmental Objective been changed since Board Approval of the Program? Yes No Page 1 of 9

Component(s) Component Name Component Cost UPGRADING 500 KV AND 220 KV TRANSMISSION SYSTEMS 148.80 DSM PHASE 2 BY EVN 2.14 UPGRADING THE 110KV SUBTRANSMISSION SYSTEMS FOR RURAL ELECTRIFICATION 124.80 PROGRAMS REHABILITATION OF EXISTING SMALL HYDRO PLANTS AND WIND-DIESEL POWER PLANT 7.80 FOR PHU QUOC ISLAND COMMUNITY-BASED HYBRID RENEWABLE ENERGY GRIDS 4.20 CREATION OF DISTRICT AND COMMUNE-LEVEL JOINT STOCK DISTRIBUTION COMPANIES 2.85 STRENGTHENING REGULATION, PLANNING AND IMPLEMENTATION CAPACITY FOR 3.50 RENEWABLE ENERGY PROJECTS EVN STAFF TRAINING PROGRAM 3.00 EVN TECHNICAL ASSISTANCE 2.90 TECHNICAL SUPPORT TO ERAV AND NLDC 3.39 IMPROVEMENT OF MANAGEMENT INFORMATION SYSTEM 0.55 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Progress towards achievement of GEO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Low Implementation Status Overview The project has achieved its development objectives. All of the project key indicators have been achieved or exceeded. The key indicator of number of transmission line faults at 500 kv and 220 kv at the end of the project was reduced to 0.310 and 0.553, respectively compared to the target of 0.321 and 0.578. The system losses also reduced to 2.56% and 6.80% for the transmission and distribution networks compared to the target of 3.75% and 7.25%. Capacity of the Electricity Regulatory Authority of Vietnam (ERAV) and National Load Dispatch Center (NLDC) has been improved and sound regulations and procedures on tariffs and power generation market have been in place. Policy and regulations promoting renewable energy have been also in place effectively supporting the Government renewable energy development program. In total, 900 MVA 500 kv; 490 km/3313 MVA 220kV and 965km/3210 MVA 110 kv have been built and installed. The Demand-side Management measures contributed to reduce up to 331 MW peak load. 5 small hydropower plants with total capacity of 15 MW have been rehabilitated. About 1700 rural households benefited from improved service through the remote area renewable energy program. Locations Country First Administrative Division Location Planned Actual Vietnam Tinh Nghe An Tinh Nghe An Vietnam Tinh Soc Trang Tinh Soc Trang Page 2 of 9

Country First Administrative Division Location Planned Actual Vietnam Tinh Tuyen Quang Tinh Tuyen Quang Vietnam Tinh Yen Bai Tinh Yen Bai Vietnam Tinh Lao Cai Tinh Lao Cai Vietnam Tinh Bac Lieu Vinh Loi Vietnam Tinh Tay Ninh Suoi Vang Vietnam Tinh Soc Trang Tuan Tuc Vietnam Tinh Thua Thien-Hue Tinh Thua Thien-Hue Vietnam Tinh Soc Trang Thuan Hung Vietnam Thanh pho Ho Chi Minh Thanh pho Ho Chi Minh Vietnam Tinh Thanh Hoa Tinh Thanh Hoa Vietnam Tinh Thai Binh Tinh Thai Binh Vietnam Not Entered Tan Dinh Vietnam Tinh Quang Nam Tam Ky Vietnam Tinh Son La Tinh Son La Vietnam Tinh Soc Trang Soc Trang Vietnam Tinh Quang Tri Tinh Quang Tri Vietnam Tinh Quang Ninh Tinh Quang Ninh Vietnam Tinh Ca Mau Nam Can Vietnam Tinh Soc Trang My Huong Vietnam Tinh Quang Ninh Mong Duong Vietnam Tinh Soc Trang Long Hung Vietnam Tinh Long An Tinh Long An Vietnam Tinh Lai Chau Tinh Lai Chau Vietnam Tinh Kien Giang Kien Luong Vietnam Tinh Khanh Hoa Tinh Khanh Hoa Page 3 of 9

Vietnam Tinh Quang Ninh Ha Long Vietnam Tinh Quang Nam Hoi An Vietnam Tinh Ha Tinh Tinh Ha Tinh Vietnam Tinh Ha Giang Tinh Ha Giang Vietnam Thanh Pho Hai Phong Haiphong Vietnam Tinh Dong Nai Tinh Dong Nai Vietnam Tinh Da Nang Turan Vietnam Tinh Lam Dong Da Lat Vietnam Tinh Dac Lak Tinh Dac Lak Vietnam Tinh Quang Ninh Cua Ong Vietnam Tinh Son La Chieng Ngam Vietnam Tinh Binh Dinh Tinh Binh Dinh Vietnam Tinh Bac Lieu Bac Lieu Vietnam Tinh Ben Tre Thi Xa Ben Tre Vietnam Tinh Soc Trang My Tu Huyen Vietnam Tinh Soc Trang Huyen My Xuyen Vietnam Tinh Soc Trang Huyen Thanh Tri Vietnam Tinh Can Tho Huyen Chau Thanh Vietnam Tinh Can Tho Huyen O Mon Vietnam Tinh Can Tho Huyen Thot Not Vietnam Tinh Can Tho Huyen Phung Hiep Vietnam Tinh Can Tho Huyen Long My Vietnam Tinh Kien Giang Huyen Tan Hiep Vietnam Tinh Kien Giang Huyen Hon Dat Vietnam Tinh Gia Lai Thi Xa Pleiku Page 4 of 9

Vietnam Tinh Long An Huyen Can Giuoc Vietnam Tinh Long An Huyen Ben Luc Vietnam Tinh Long An Huyen Thu Thua Vietnam Tinh Quang Ninh Thi Xa Cam Pha Vietnam Thu Do Ha Noi Huyen Dong Anh Vietnam Tinh Lam Dong Thanh Pho Da Lat Vietnam Tinh Lam Dong Huyen Da Teh Vietnam Tinh Lam Dong Huyen Lac Duong Vietnam Tinh Bac Ninh Tinh Bac Ninh Vietnam Tinh Bac Giang Tinh Bac Giang Vietnam Tinh Da Nang Tinh Da Nang Vietnam Tinh Binh Duong Huyen Ben Cat Vietnam Tinh Binh Phuoc Huyen Binh Long Vietnam Tinh Binh Phuoc Huyen Phouc Long Vietnam Tinh An Giang Huyen Chau Phu Vietnam Tinh An Giang Huyen Tri Ton Vietnam Tinh An Giang Huyen Tinh Bien Vietnam Tinh Thai Nguyen Tinh Thai Nguyen Vietnam Tinh Quang Nam Huyen Dien Ban Vietnam Tinh Quang Nam Huyen Dai Loc Vietnam Tinh Dong Nai Huyen Tan Phu Vietnam Tinh Binh Thuan Thi Xa Phan Thiet Vietnam Tinh Binh Thuan Huyen Ham Thuan Nam Vietnam Tinh Vinh Phuc Huyen Vinh Tuong Vietnam Tinh Phu Tho Tinh Phu Tho Page 5 of 9

Vietnam Tinh Quang Ngai Huyen Tu Nghia Vietnam Tinh Quang Ngai Huyen Binh Son Vietnam Tinh Quang Ngai Huyen Nghia Hanh Vietnam Tinh Quang Ngai Huyen Mo Duc Vietnam Tinh Ha Nam Tinh Ha Nam Vietnam Tinh Thua Thien-Hue Huyen Phong Dien Vietnam Tinh Bac Lieu Tinh Bac Lieu Vietnam Tinh Ca Mau Huyen Tran Van Thoi Vietnam Tinh Ca Mau Huyen Cai Nuoc Vietnam Tinh Ca Mau Huyen Dam Doi Vietnam Tinh Vinh Phuc Tinh Vinh Phuc Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Improving overall system efficiency to reduce losses & remove bottlenecks; rehab. of distrib netwk in rural econ. growth ctrs.& reduce peak demand & electricity consmptn thru large-scale DSM activts. Improved capacity of ERAV and a sound tariff regulations and efficient framework for power generation market in place Text Value Number of transmission line faults (time/year/100km) for 500kV/ 220kV/ 110kV: Transmission/Distribution losses % 500 kv: 0.34/ 220 kv: 0.61/ 110 kv: 3.4 Lossess: 4.35/8.65 (%) Number of transmission line Number of transmission line faults (time/year/100km) for 500kV/ 220kV/ 110kV: 0.310/0.553/3.170 Transmission/Distribution losses %: 2.56/6.80 (%) Project is completed on time and thereafter well operated and maintained 500 kv: 0.321/ 220 kv: 0.578/ 110 kv: 3.221 Losses: 3.75/7.25 (%) 18-Jan-2002 15-Dec-2012 31-Dec-2012 Text Value None ERAV capability to ERAV ERAV staff is capable to capability to effectively effectively prepare and get prepare and implement stakeholder supports for new regulations and regulations and to enforce implementation procedures these regulations after has been improved. 21 issuance regulations including key decisions on market design Page 6 of 9

Global Environmental Objective Indicators sector restructures and tariff reform have been issued and enforced training. 06-Dec-2007 15-Dec-2012 31-Dec-2012 Indicator Name Core Unit of Measure Baseline Current End Target Reduction of greenhouse gas emissions through electricity production from renewable energy and energy efficiency Text Value None The target has been achieved. GoV signed Renewable Energy Development Project in June 2009 18-Jan-2002 15-Dec-2012 The target has been achieved. GoV signed Renewable Energy Development Project in June 2009 Government approval of a large scale renewable energy program 31-Dec-2012 Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Length of transmission line (km)/installed capacity of substations (MVA) under the project for: 1) 500 kv 2) 220 kv 3) 110 kv Text Value 1) 500 kv:0 2)220 kv:0 3)110 kv:0 1)500 kv: 0km/900MVA 2)220 kv: 490km/3313 MVA 3)110 kv: 965 km/3210 MVA 30-Jun-2003 15-Dec-2012 31-Dec-2012 1) 500 kv:0/450 MVA 2)220 kv:470 km/3370 MVA 3)110 kv:910 km/1700 MVA Rural access: number of new households electrified from off grid or minigrid Increase in grid connected small hydro rehabilitated under the project Text Value 0 Provided electricity to 460 10,000 households households and improved service to more than 1200 households 30-Jun-2003 15-Dec-2012 31-Dec-2012 Text Value 0 14.9 15 MW 30-Jun-2003 15-Dec-2012 31-Dec-2012 This component has been finished. Page 7 of 9

Power Sector reform (continue) 1) Number of ERAV staff received training 2) Number of regulations effective Data on Financial Performance (as of 28-Dec-2012) Text Value Not in place 1) 227 staff received formal training, of which from ERAV and relevant agencies are 132 and 95, respectively. 2) 21 tariff, market and technical codes regulations have been issued; 18 market and technical procedures have been issued 06-Dec-2007 15-Dec-2012 31-Dec-2012 1) 75 formal training received by ERAV staff; 2) A2. 16 tariff, market and technical codes regulations issued; at least 5 market procedures and 5 technical procedures effective Financial Agreement(s) Key s Project Ln/Cr/Tf Status Approval Signing Effectiveness Original Closing Revised Closing P066396 IDA-36800 Closed 25-Jun-2002 24-Oct-2002 19-Feb-2003 31-Dec-2007 31-Dec-2012 P066396 IDA-47810 Closed 23-Jun-2010 13-Aug-2010 11-Dec-2010 31-Dec-2012 31-Dec-2012 P073778 TF-51229 Closed 24-Oct-2002 24-Oct-2002 19-Feb-2003 31-Dec-2007 31-Dec-2010 Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P066396 IDA-36800 Closed USD 225.00 225.00 0.00 271.88 1.01 121.00 P066396 IDA-47810 Closed USD 26.51 26.51 0.00 15.10 11.95 57.00 P073778 TF-51229 Closed USD 4.50 4.09 0.41 4.09 0.00 100.00 Disbursement Graph Page 8 of 9

Key Decisions Regarding Implementation None Restructuring History Level two Approved on 29-Jun-2005, RVP Approved on 13-Nov-2007, CD Approved on 21-May-2009, Level two Approved on 30-Dec-2009 Related Projects P073778-System Efficiency Improvement, Equitization & Renewables Project (GEF Renewable Component), P120540-SEIER Additional Financing Page 9 of 9