(ONE PIECE GRID, UP TO U96)

Similar documents
Package Vending. Specification. 426 Industrial Boulevard Kearneysville WV Phone: (304) Fax: (304)

User Guide WINE CELLAR. Contents I GB F. Installation, 2 Location and power connection Technical information D E P

Product Description. Characteristic features. Further highlights. General Product Description Roller Rail Systems

Orion Plus metal IP65 enclosures

INSTRUCTION MANUAL MODELS: RT-30, RT-36, RT-48, RT-60 & RT-72 REVISED APRIL, 2003 *PLEASE RETAIN FOR FUTURE REFERENCE

Downflow Conversion Kit used to Modify Air Handler Units for Downflow Application

assembly guide ELECTRIC Model Numbers: Estimated time required for assembly: 1 Hour (English) /05/09

HEAVY-DUTY 16 ga, T-304 S/S 20" 20 1/2" OR SPECIFY 1 1/2" 3/4"

T H E T H AT HELPED LAUNCH M E N U APPEAL AND A NEW ERA OF.

UNEQUAL FLANGE EQUIPMENT RACKS

AIR CONDITIONERS WA13 SERIES

FORM NO. ATZ-221 Supersedes Form No. ATZ-210 AIR CONDITIONERS

Kettle Charcoal Kettle Grill 261 KEY FEATURES

CHARCOAL SERIES EXPERTS IN GAS & INFRARED GRILLING. napoleongrills.com.au

SIMPLEX STRAINER MODEL 90

BUILT IN DELUXE SPIT BRAAI MODELS: 1200 & 1500

Thank you for purchasing cake templates designed by:

INFRARED BURNER KIT INSTRUCTIONS

Product Name Charcoal Grill Unit Carton Dimensions (Inches) L W H

8.1 - Installation of Sander PRICE $500.00

BUILT IN ROTISSERIE BRAAI MODEL: 1000

3,000 POUND CAPACITY AUTO BODY ROTISSERIE UNIT

Lab 2-1: Measurement in Chemistry

PRACTICAL RUGGED STYLISH UNIQUE TABLETOP ACCESSORIES

Activity Instructions

illuminating possibilities FEATURING i-glow BACKLIT TECHNOLOGY By Napoleon

SHOWCASES & COUNTERS

NU 620 Performance Evaluation

Bridge Overhang Brackets

IMPORTANT: READ THESE INSTRUCTIONS CAREFULLY BEFORE STARTING INSTALLATION OR USE. WARNINGS AND SAFETY CODES

STEAM TUBES OVENS RANGE

FREE. install. BARBEQUE ASSEMBLY with the purchase of ANY full-size gas BBQ Plus GUARANTEED in. & connect to your gas line see in-store for details.

Installation Instructions and Operator's Manual

WARNING. Assembly and Operating Instructions for Outback Omega Charcoal 100 and Omega Charcoal 200 Barbecues. Omega Charcoal 100 Omega Charcoal 200

MASTERRANGE SMOKEHOUSES THE TOWN SMOKER

INTRODUCTION TO CUSTOM FABRICATED STRAINERS

Jura S Series Grinder Replacing

LARGE GOURMET GURU GRILL ASSEMBLY INSTRUCTIONS

Produce Case Survey. Revised 3/21/17

Cutout Width 28 5/8 28 5/8 40 1/4 40 1/4 (72.7 cm) (72.7 cm) (102.2 cm) (102.2 cm)

Additional Features: Durable Seamless Welds and Attractive Polished Edges

Owner's Manual: Stainless Steel Rotisserie Kit for Kenmore Elite & Kenmore Premium Grills

18-Bottle Dual Zone Slimline Edition Touchscreen Refrigerator

NORTH / 1kg. Mill City Roasters, LLC rd Ave SE Minneapolis, MN 55414

SEAR, SMOKE, ROTISSERIZE. REPEAT ALL YEAR LONG. Prestige

Unsere aktuellste Innovation:

For Jura parts, repairs & tech support, contact: Services Unlimited, Inc./ Parts Guru

Powder Booths GLOBAL FINISHING SOLUTIONS GLOBALFINISHING.COM GLOBAL FINISHING SOLUTIONS

LIFT PROGRAMME ROLLER GUIDES FK + GG RFG + RFGK GGW + RFGW TRF. Special roller guides 10/2015

Clean & Simple Cake Design

VCS325SSBI Series and VCS525SSBI Series Assembly Procedures

MTN Products. AquaCafé r (Touch Capsules) Installation & Operations Manual

E N T E R P R I S E S

Universal Ignitor Upgrade Kit

PART 2. SIGNS Chapter 2J. Specific Service (Logo) Signs

Skokie Glenview Wheeling Big John Grill

13 SEER CONDENSING UNITS

RH PETERSON COMPANY AMERICAN OUTDOOR GRILL COLLECTION CATALOG 2012

A CM "Opera" Dual Cavity Cooker with Gas Hob, Stainless steel Energy rating A (Main Oven) Energy rating A (Auxiliary oven)

C-21G0CB Char-Broil ,500 BTU 2B

Operator Manual 100 Series Coffee Grinders

KETTLE BBQ - JDWCKBBQ

Science of Tray Dried Raisins Bill Peacock and Pete Christensen*

Thank you for purchasing cake templates designed by:

Assembly Procedures VCS322SSBI Series / VCS522SSBI Series

REVERSIBLE DOOR 1. LAMP SWITCH 2. CABINET 3. LEVELLING LEGS 4. WINE RACK 5. GLASS DOOR 6. CHROME SHELVES 7. INTERIOR LAMP 8.

INSTALLATION MANUAL TG - ROTISSERIE OVEN MODELS

INSTALLATION and OPERATION MANUAL for GXD SERIES BREWERS

PREMIUM OUTDOOR GRILLS

CPF48UGMYW New product

Vertical Charcoal Smoker 365

The Industry s Largest Source for Professional Outdoor Products

EFFICIENT 13 SEER AIR CONDITIONER ENVIRONMENTALLY SOUND R 410A REFRIGERANT

Appendix F Flow Charts

P O L I C I E S & P R O C E D U R E S. Single Can Cooler (SCC) Fixture Merchandising

TRIPLE INFUSION PUMP WITH AUTOMATIC CYCLING TIMER

Models. Standard Features. Options

NorCal Ovenworks Residential Grills

24-Bottle 2-Temp Touchscreen Refrigerator

2014 Artisan Price Sheet V4.0 Effective February 1, 2014

Barbecue swing W9C-4 SS Steel G30/30 EU

Smoke Cabinet SAVE THESE INSTRUCTIONS!

2019 grills & ACCESSORIES

BBQ Machines. In This Section RO-1 Rotisserie Oven N RO-1-WB Rotisserie Oven with Warmer Base N RO-6 Rotisserie Oven N-3...

2017 Price List. Effective Date: October 12, 2016 PREMIUM GRILLS

RH PETERSON COMPANY AMERICAN OUTDOOR GRILL COLLECTION CATALOG 2014

Latin Touch Whole Brisket Worksheet

Product Info. Search Details: WW27210B, Jenn-Air Electric 27 in. Double Wall Oven

Product Specifications

Complete Drain, Complete Line, Complete Solutions. Easy leveling drain for a True Set every time!

TYPE AESTHETICS CONTROLS PROGRAMS / FUNCTIONS OPTIONS TECHNICAL FEATURES

MAINLINE AIR CONDITIONERS

YOU DIRECTED PROS REFINED WE DESIGNED TRAEGERGRILLS.COM

DO STEAK JUSTICE. LEX SERIES LEX SERIES. napoleongrills.com

COLD SMOKER MANUAL. A Guide To Using Your Traeger Cold Smoker (BAC253) Contents Traeger Pellet Grills LLC

DO STEAK JUSTICE. LEX SERIES napoleongrills.com

Grooving Tool: used to cut the soil in the liquid limit device cup and conforming to the critical dimensions shown in AASHTO T 89 Figure 1.

OWNER S MANUAL. IMPORTANT: This instruction manual contains important information necessary for the proper assembly and safe use of the appliance.

A951A/S PRODUCT SPECIFICATIONS SINGLE STAGE GAS FURNACE CONTROLS VENTING INSTALLATION FEATURES WARRANTY CONFIGURATIONS HEAT EXCHANGER DESIGN BURNER

Introduction. No Hassle Guarantee

Transcription:

(ONE PIECE GRID, UP TO U96) Step 1: Set up shelving sections following display shelving installation instructions 01-13 using either BR_ OR BRHD_ bottom rails. See retainer types on page 2. TOP RAIL (R_T) WIRE GRID (RUS_) EXTENSION WIRE GRID RAIL (RES_) STANDARD DUTY (BR_) HEAVY DUTY (BRHD_) OR FIGURE 1 WIRE GRID ASSEMBLY PAGE 1 OF 6

Step 2: A) Install the lower horizontal wire grid retainer (RES_) on the bottom rail. B) Install the wire grid back on top of the lower horizontal wire grid retainer. The wire grid back should locate in the channel of the lower horizontal wire grid retainer. NOTE: See Figure 3 for wire grid back orientation. C) On each side of the wire grid back, slide the vertical wire grid retainers (RES_) down between the uprite and the wire grid back. The wire grid back should locate in the channel of the vertical wire grid retainer. If the wire grid back is taller than a nom 48, the vertical wire grid retainer will be a two piece retainer (RES_ and an RUS_). NOTE: If using triple track wire grid retainers (RET_) with a centered hardboard back, slide the hardboard back down the center channel of the retainers prior to installing the upper vertical wire grid retainers (RUT_). D) Install the upper horizontal wire grid retainer (RES_) on top of the wire grid back. The wire grid back should locate in the channel of the upper horizontal wire grid retainer. E) For systems with two backs vertically (taller than U96) go to page 3. Systems U96 and shorter, go to step F). F) Install the top rail (R_T). TYPES: WIRE GRID (RBE_WG) RET_ RES_ RED_ SINGLE TRACK DOUBLE TRACK TRIPLE TRACK PAGE 2 OF 6

Step 3: A) Install the splicer rail (R_S). TOP RAIL (R_T) (MULTI-PIECE GRID, TALLER THAN U96) B) Install the lower horizontal wire grid retainer (RES_) on the splicer rail. C) Install the wire grid back on top of the lower horizontal wire grid retainer. The wire grid back should locate in the channel of the lower horizontal wire grid retainer. NOTE: See Figure 3 for wire grid back orientation. D) On each side of the wire grid back, slide the vertical wire grid retainers (RES_) down between the uprite and the wire grid back. The wire grid back should locate in the channel of the vertical wire grid retainer. If the wire grid back is taller than a nom 48, the vertical wire grid retainer will be a two piece retainer (RES_ and an RUS_). E) Install the upper horizontal wire grid retainer on top of the wire grid back. The wire grid back should locate in the channel of the upper horizontal wire grid retainer. F) Install the top rail (R_T). SPLICER RAIL (R_S) WIRE GRID (RUS_) EXTENSION WIRE GRID (RES_) STANDARD DUTY (BR_) OR HEAVY DUTY (BRHD_) FIGURE 2 WIRE GRID ASSEMBLY WITH SPLICER PAGE 3 OF 6

TOP BOTTOM 2 1/2 RBE_MG TOP BOTTOM 3 RBE_SG TOP 4 1/2 BOTTOM RBE_WG FIGURE 3 WIRE ORIENTATION 3 1/2 PAGE 4 OF 6

UPRITE HEIGHT LOWER WIRE WIRE WIRE S AND S LOWER WIRE ACTUAL SIZE "B" DIM WIRE ACTUAL SIZE "C" DIM LOWER 36 RBE_30_ N/A 29 N/A RE_30 N/A N/A N/A 42 RBE_36_ N/A 35 N/A RE_36 N/A N/A N/A 48 RBE_42_ N/A 41 N/A RE_42 N/A N/A N/A 54 RBE_48_ N/A 47 N/A RE_48 N/A N/A N/A 60 RBE_54_ N/A 53 N/A RE_48 RU_06 N/A N/A 66 RBE_60_ N/A 59 N/A RE_48 RU_12 N/A N/A 72 RBE_66_ N/A 65 N/A RE_48 RU_18 N/A N/A 78 RBE_72_ N/A 71 N/A RE_48 RU_24 N/A N/A 84 RBE_78_ N/A 77 N/A RE_48 RU_30 N/A N/A 90 RBE_84_ N/A 83 N/A RE_48 RU_36 N/A N/A 96 RBE_90_ N/A 89 N/A RE_48 RU_42 N/A N/A 102 RBE_48_ RBE_48_ 47 47 RE_48 N/A RE_48 N/A 108 RBE_48_ RBE_54_ 47 53 RE_48 N/A RE_48 RU_06 114 RBE_48_ RBE_60_ 47 59 RE_48 N/A RE_48 RU_12 120 RBE_48_ RBE_66_ 47 65 RE_48 N/A RE_48 RU_18 126 RBE_48_ RBE_72_ 47 71 RE_48 N/A RE_48 RU_24 132 RBE_48_ RBE_78_ 47 77 RE_48 N/A RE_48 RU_30 138 RBE_48_ RBE_84_ 47 83 RE_48 N/A RE_48 RU_36 144 RBE_48_ RBE_90_ 47 89 RE_48 N/A RE_48 RU_42 Notes: 1) Wire backs can be 3x3 wire grid (RBE_WG), slot grid (RBE_SG), multi grid (RBE_MG) or louver grid (RBE_LG). 2) The bottom rail must always be a BR_ or BRHD_. (See order for actual parts) 3) The horizontal retainers will be RES_, RED_ or RET_, where _ is the nominal width of the system. 4) The upper and lower horizontal retainers are identical. 5) Wire backs can be replaced with hardboard backs (RBE*P, RBE*M or RBE*ME). 6) Units taller than 96H require a splicer rail. PAGE 5 OF 6

-------- -------- -------- -------- BACK TYPE WIRE MERCHANDISING LOAD MATRIX RAIL TYPE NOM 30" WIDE AND LESS U96 OR SHORTER (SINGLE PIECE BACK WITHOUT A SPLICER RAIL (R_S)) NOM 30" WIDE AND LESS TALLER THAN U96 (MULTI PIECE BACK WITH SPLICER RAILS (R_S)) NOM 3' AND 4' WIDE NOM 3' AND 4' WIDE U96 OR SHORTER (SINGLE PIECE BACK WITHOUT A SPLICER RAIL (R_S)) TALLER THAN U96 (MULTI PIECE WITH SPLICER RAILS (R_S)) 3 x 3 Wire Grid BR_ 150 lbs 150 lbs 150 lbs 150 lbs 3 x 3 Wire Grid BRH_ 350 lbs 350 lbs 350 lbs 350 lbs Slot Grid BR_ 150 lbs 150 lbs 150 lbs 150 lbs Slot Grid BRH_ 350 lbs 350 lbs 350 lbs 350 lbs Multi Grid BR_ 140 lbs * 130 lbs * 120 lbs * 100 lbs * Multi Grid BRH_ 340 lbs * 330 lbs * 300 lbs * 270 lbs * Louver Grid BR_ 120 lbs * 90 lbs * Not Recommended Not Recommended Louver Grid BRH_ 320 lbs * 290 lbs * 250 lbs * 200 lbs * Notes: 1) Items marked with * are derated for the weight of the back. 2) The above load ratings assume that the bottom rail tab is bent per II 01 13 for single sided sections. 3) For backs nom 60" wide, reduce the above loads for a nom 3 and 4' wide by 20% (multiply above loads by 0.80). 4) For shorter systems, when the wire grid or slotwall back panel is shorter than nom 90" tall or nom 144 tall, you can calculate a higher merchandising load by adjusting for the difference in the weight of the back panels. Note: Do not exceed 150 lbs per side or 300 lbs total per section when using a standard bottom rail. Includes the back weight and the merchandising weight. Note: Do not exceed 350 lbs per side or 700 lbs total per section when using a HD bottom rail. Includes the back weight and the merchandising weight. PAGE 6 OF 6