SERVICE MANUAL ESPRESSO COFFEE BREWER UNITS

Similar documents
INSTALLATION AND WARRANTY CERTIFICATE. Machine model Serial Number # Rating and optional. Installation Company: Technician ID: Date: / /

MODELS 1315 & 1315-S La Pavoni CLUB COMBO

For Jura parts, repairs & tech support, contact: Services Unlimited, Inc./ Parts Guru

CAIMANO SPECIAL450 BARISTA

Wega Mininova 2003 Installation Instructions

CafeRomatica NICR7.. Fully automatic coffee centre Operating Instructions and Useful Tips. A passion for coffee.

Hotpoint H/A - Ariston automatic, built-in coffee machine MCX 103 X - MCK 103 X/HA

A N F I M Srl. Caimano: Timer / Automatico / Manuale Super Caimano: Timer / Automatico Caimano SPecial 450: Timer / Automatico

A N F I M Srl. Caimano On Demand. Super Caimano COFFEE GRINDER C O D Y S C O D Y - II. Model

1. IMPORTANT SAFEGUARDS When using electrical appliances, basic safety precautions should always be followed to reduce the risk of fire, electric

HD8828 HD8834 USER MANUAL. Super automatic espresso coffee machine 3100 series. Read carefully before using the machine.

EP3559, EP3558 EP3551, EP3550

SAFETY INSTRUCTIONS FOR USE

Automatic Coffee Machine Instruction Manual

MODEL: POD BREWER AURORA SAF 68 HOMEMAKER ESPRESSO MAKER WITH COFFEE POD

Lusso / Espresso Si' Models:PL-16 PAB-16. Made In Italy

HD8847 HD8848 USER MANUAL. Super automatic espresso coffee machine 4000 series. Read carefully before using the machine.

BZ35 Espresso Machine

Programmable Espresso Machine

GAGGIA VALUES LONG ESPRESSO TRADITION AT HOME AS IN COFFEE SHOP EASY MULTIPLE CHOICE

Clean and sanitize hot sundae topping pumps Weekly SS 1 W3

CMC DUO. Standard version. Table of contens

Burr Grinder. Automatic burr grinder with 17-position grind selector. Instruction Booklet EM0430

SERVICE MANUAL EM Artista Espresso Machine ISSUE: DATE: 11 February EM5900 Artista Espresso Machine Issue: A Page 1 of 23

USER MANUAL Type HD8772

Micro Casa Semiautomatica

SOLISTA ESPRESSO - 220V 50HZ

KREA - Espresso - 230V 50HZ

Micro Casa a Leva Training Manual

EP5961, EP5960, EP5365 EP5364, EP5363, EP5361 EP5360

Design celebrates functionality.

PICOBARISTO HD8924 EN DE ES FR IT NL USER MANUAL BENUTZERHANDBUCH MANUAL DEL USUARIO MODE D EMPLOI MANUALE UTENTE GEBRUIKSAANWIJZING

DE MANUAL BENUTZERHANDBUCH SM7683, SM7680 SM6080/SM6081/SM7080/SM7081 USER MANUAL BENUTZERHANDBUCH BENUTZERHANDBUCH

OPERATING MANUAL. Sample PRO 100 Series. Electric Heating. Applies to Versions: SPE1*, SPE2, SPE4, SPE6

Coffee System Troubleshooting and Repair


EP5315, EP5314 EP5313, EP5311 EP5310

MACHINE DISPOSAL.

Armonia Smart. Quick Start Guide MACHINE DESCRIPTION STARTING UP

MTN Products. AquaCafé r (Touch Capsules) Installation & Operations Manual

Rev.02 del The manufacturer reserves the right to change the features of the product without prior notice.

SERVICE MANUAL BRIO 250 BASIC TECHNICAL MANUAL THE CONTENTS OF THIS DOCUMENT ARE INTENDED FOR NECTA S AFTER SALES PERSONNEL.

Type HD8754 USER MANUAL

USER MANUAL JOLLY PRESTIGE - COFFEE MACHINE

Maintenance guide. Maintenance Guide 1

Type HD8852 USER MANUAL

EP5934, EP5930, EP5346 EP5345, EP5340, EP5335 EP5334, EP5333, EP5331 EP5330, EP5045, EP5040 EP5035, EP5034, EP5030

Services Unlimited, Inc./ Parts Guru

TEA CATER USER MANUAL. UM_EN Part No.:

USER MANUAL Type HD HD8885

Medfusion 3500 V6. Syringe Infusion Pump. Quick Reference Card

OPTIMA PLUS-SOFT PLUS

blue 1 group 2 groups

Aulika Top HSC High speed cappuccino. Saeco Vending & Professional

COFFEE GRINDER. Owner s Manual

EXPOBAR OFFICE MACHINES

TECHNICAL INFORMATION CVA615 Coffee System

SAVE THESE INSTRUCTIONS THIS PRODUCT IS FOR HOUSEHOLD USE ONLY

MANUAL FOR USE AND MAINTENANCE. Vivaldi LSC 008 REV. 01

instructions COFFEE GRINDER KG 79/89

Service Service. Gaggia Unica. Revision 00 June Coffee Machine RI Table of contents

HD8841 HD8842 USER MANUAL. Super automatic espresso coffee machine 4000 series. Read carefully before using the machine.

Model GPX Precision Disc Style Coffee Grinder

Type HD8753 USER MANUAL

Quick Reference Guide

Type HD8836 / HD8837 SUP 037DR OPERATING INSTRUCTIONS

Monza Deluxe Super Automatic Espresso Machine

SOLISTA ESPRESSO - 23

2007 Miele USA. TECHNICAL INFORMATION CVA615 Coffee System

OPERATING INSTRUCTIONS FOR YOUR SAFETY CAREFULLY READ THE OPERATING INSTRUCTIONS. FOR HOUSEHOLD USE ONLY

Using your Grinder: Fig.1 Fig. 2

Type HD8851 USER MANUAL

PARTS CATALOG ESPRESSO EP SYSTEM

Type HD8752 / HD8881 USER MANUAL

IMPORTANT INSTRUCTIONS MODE D EMPLOI IMPORTANT INSTRUCIONES IMPORTANTES ISTRUZIONI IMPORTANTI

ORIGINAL LINE A USER MANUAL

E N T E R P R I S E S

USER MANUAL. Fully-automatic Coffee Machine

Type HD8833 SUP 037R OPERATING INSTRUCTIONS

PORTABLE ESPRESSO MACHINE. Compatible Ground Coffee only. Designed by

Operating instructions

Instruction manual LIVIA G4 DEPID LIVIA G4 PM

Type HD8749 GAGGIA NAVIGLIO DELUXE. User manual

Type HD8858 / HD8859 USER MANUAL

PLEASE READ THIS MANUAL BEFORE USE. SAVE FOR FUTURE REFERENCE.

SERVICE MANUAL. Revision 02 December 2012

Installation & Parts Manual 2" & 3" High Capacity Strainers For Class 1, Petroleum Applications

For Jura parts, repairs and tech support, contact: Services Unlimited, Inc./ Parts Guru

Operating the Rancilio Silvia after PID kit modification Version 1.1

1 Safety Safety use Installation Maintenance Extended down time 8

Fig. 8 Fig. 9 Fig. 10 U V W T. Fig. 13. Fig. 11 Fig. 12. M/a. Fig. 1. MAX 1,5 lt. Fig. 15. Fig. 14. Fig. 2 Fig. 3 Fig. 4. Fig. 5. Fig. 6 Fig.

Door. Cabinet assy Electric system Tank hydraulic system 500 cc. (water supply) Mixer and canister Grinder Oversize chambe coffee unit Cabinet

SAVE THESE INSTRUCTIONS

Scanomat TopBrewer Daily Cleaning

+ = Power up your Smart Cup while pressing the corresponding button to reach different program modes. Heat Exchange fill/tank Drain Page:

Always here to help you

Models 2450 & Espressimo TM Espresso Cappuccino Machines. Operation & Installation Manual TABLE OF CONTENTS. For

Coffee Burr Grinder. Model #559. Instructions. Warranty

DISCONTINUED VERSION The information in this manual is no longer current. Espresso/Cappuccino OPERATING & SERVICE MANUAL BUNN-O-MATIC CORPORATION

Service Manual. Service. Minuto. Rev. 04 October Coffee Machine

Transcription:

AFTER-SALES SERVICE SERVICE MANUAL ESPRESSO COFFEE BREWER UNITS Z 3000V (with variable brewing chamber) Z-3000 var 13/10/2005 page 1 / 11

ESPRESSO COFFEE BREWER UNITS Z 3000 V ESPRESSO The espresso coffee brewer unit Z3000 V is practically an evolution of the Z 3000 model, but with changes to the size of the brewing chamber (45 mm dia) to allow the development of the version with variable size chamber and for special applications. The upper filter piston can change the protrusion of the filter holder, so as to vary the height of the brewing chamber. In addition, the unit was designed for installation inside the machine leaning either to the left or to the right, allowing more option for present and future developments. FIG 1 Perspective view of unit in brewing position THE BREWER UNIT COMPRISES: 1) RIGHT AND LEFT SUPPORT 2) PISTONE MOBILE COMPLETO 3) GRUPPO CAMERA DI INFUSIONE E CONVOGLIATORE 4) SIDE SLIDES 5) ROTATING LEVER 6) OSCILLATING LEVER FOR EJECTING THE USED CAPSULE 7) RODS Two handles are located on the two external sides for controlling the rods, connected to each other by a steel pin. And similarly to the previous model, a brewing chamber heating system is fitted for some specific applications. The new system differs slightly from the previous one, and its shape was changed to be able to adapt it to different models. FIG 2 BREWER UNIT COMPLETELY DISASSEMBLED 1 2 3 4 7 6 5 Z-3000 var 13/10/2005 page 2 / 11

DESCRIPTION OF BREWER UNIT OPERATION In an espresso coffee brewer unit for automatic vending machines, in order to obtain coffee with taste and quality parameters that are as much as possible similar (if not better) than the drinks obtained with a machine used in the bar, as well as the intrinsic characteristics of the brewer unit, there must be some objective conditions to be met, and namely: 1) THE COFFEE QUALITY AND AMOUNT AND ITS GRADE OF GRINDING 2) THE TEMPERATURE AND CHARACTERISTICS OF THE BOILER 3) THE BREWING AND DISPENSING TIME 4) THE WATER AMOUNT N.B.: The following reference information is valid exclusively for Italian espresso coffee selections; for other markets and other requirements refer to the information supplied with the machine. 1) THE COFFEE QUALITY AND AMOUNT AND ITS GRADE OF GRINDING Coffee quality and amount are ensured by the grinder and doser assembly fitted to the unit, capable of preparing coffee with optimum grade of grinding. The Z3000 V unit can operate with doses of 5.5 to 12 g of ground coffee. In any case, in order to get an optimum espresso coffee in a single selection the dose of ground coffee must be between 6.5 and 7 g. The other available doses are for different versions and markets 2) THE TEMPERATURE AND CHARACTERISTICS OF THE BOILER The boiler is adjusted to an optimum setting at the factory; however, in specific climate conditions or height from sea level, the setting can be adjusted through the software programming, keeping in mind that the boiler is set to approximately 94 C by default and that it is advisable to carry out the testing after stabilising the temperature, achieved after two or three on/off cycles. The boiler must be made of specific material and certified as being food-safe; N&W uses a special bronze alloy that is able to maintain the temperature constant, avoiding any temperature fluctuations and ensuring that the characteristics of the water are not altered, without the risk of toxic contamination. 3) THE BREWING AND DISPENSING TIME The brewing and dispensing time depend on the water amount settings, the coffee dose and the grade of grinding. The optimum brewing time is between 15 and 18 seconds, which is a consequence of the different parameters and cannot be set directly. The pre-brewing time is set to 1 second by default, and it refers to the time between opening the solenoid valve and starting the pump. The brewing time can be increased (within a certain range), keeping in mind that an excessive increase does not lead to improved quality and it lengthens the total dispensing time. 4) THE WATER AMOUNT : For an Italian style Espresso coffee 40 c.c. must be set with a total amount in the cup of about 35 c.c., doses can vary for long coffee selections in other countries, but in this case the coffee DOES NOT have the characteristics of a typical Espresso coffee. It is however possible to dispense double doses for versions with double coffee selections. For other markets or specific machines, refer in any case and always to the documentation supplied with the machine. Z-3000 var 13/10/2005 page 3 / 11

OPERATING CYCLE FOR DISPENSING ESPRESSO COFFEE STANDBY AND COFFEE FILLING POSITION In this position the coffee unit is in standby. The cycle starts when the grinder and doser device releases a coffee dose as set by the software in relation to the selection made. The ratiomotor operates the brewer unit by rotating the handle 90, the position is verified by the triggering of a microswitch. PHASE 1: DISPENSING POSITION During the handle rotation, the connecting rods bring the upper piston down and at the same time the mechanism oscillates the brewing chamber to line up with the piston axis; continuing its movement the piston is inserted into the brewing chamber and the scraper is moved to the back of the chamber. PHASE 2: START OF THE PISTON COMPRESSION PHASE In this phase the water injection in the upper section of the mobile piston starts (an exchange solenoid valve and the pump perform such function - see hydraulic diagram). The pressure generated pushes the piston downwards and compensates the empty volumes according to the amount of ground coffee dispensed. The compression force is determined by a bypass valve and by a pressure switch (according to the hydraulic circuit of the machine). PHASE 3: COFFEE BREWING The pump is started and a dose of water (determined by the software), at a temperature of 95 C and pressure of 12 bar, is sent to the upper piston; water flows through the filter and enters the brewing chamber, wetting all the ground coffee, and exits from the lower section of the chamber, reaching the dispensing spouts through a silicone tube. PHASE 4: DRYING AND SQUEEZING As soon as the set dose is reached the pump stops, the pre-brewing spring returns to the initial position and squeezes the coffee dose, drying it. PHASE 5: HYDRAULIC PISTON DISCHARGE The exchange solenoid valve is triggered and the water used for the upper piston movement is discharged; the action of the return spring causes the upper piston to return to the start position. PHASE 6: EJECTION The handle controlled by the ratiomotor rotates and moves to the start position, the mechanisms move both the upper piston and the brewing chamber to the initial position; during this cycle a lower lever pushes the central rod of the brewing chamber, ejecting the spent coffee, while the scraper that also returns to the initial position brushes off the spent coffee, dropping it in the special compartment. Hydraulic circuit of unit with variable brewing chamber STANDBY AND GROUND COFFEE LOADING PHASE Z-3000 var 13/10/2005 page 4 / 11

STAND-BY POSITION (stand-by Phase) FIG. 1 FIG. 2 FIG. 3 Phase 1 Phase 2-3 Phase 4-5 Phase 6 Z-3000 var 13/10/2005 page 5 / 11

OPERATION DIAGRAM OF HEATING SYSTEM FOR FIRST COFFEE SELECTION BREWING CHAMBER ALUMINIUM LINING SLEEVE (A) HEATER UNIT BREWING CHAMBER STANDBY POSITION READY FOR COFFEE LOADING AND TOUCHING THE HEATER SYSTEM BREWING AND DISPENSING POSITION, DETACHED FROM THE HEATER UNIT The heater system (standard feature in some versions and supplied as a Kit in others) is based on the use of a 230 V AC - PTC type heating element with an absorption of approximately 25 W at start-up and 5 W under running conditions. During the machine standby, the brewing chamber, which is lined with a die-cast aluminium sleeve (A) is brought into contact with the heating element positioned on the wall of the boiler assembly; the mechanical contact allows maintenance of the optimum temperature in the brewing chamber. During the brewing and dispensing stage, the aluminium sleeve is detached from the heating element; when the unit is brought back into standby position the thermal contact is resumed, again maintaining the correct temperature. NB: The shape of the part in contact with the heating element may vary according to the machine in which the the brewer unit is installed. FIG. 1 BREWING CHAMBER ALUMINIUM LINING SLEEVE (A) Z-3000 var 13/10/2005 page 6 / 11

DISASSEMBLY PROCEDURE FOR PERIODIC MAINTENANCE FIG. 1 FIG. 2 FIG. 3 Remove the brewer unit from the machine and clean all coffee residue Release the seeger rings from the connecting rods Slide out the rods and lay them aside. Release the other seeger rings that secure the diverting slide FIG. 4 FIG. 5 FIG.6 Using an Allen key, undo the central screw of the external handle Remove the diverting levers (FIG 4- FIG 5) FIG.7 FIG.8 FIG.9 Remove the external handle wheel Undo all screws that secure the two half shells and open the unit ( FIG 8- FIG 9 ) Z-3000 var 13/10/2005 page 7 / 11

FIG.10 FIG.11 Open the two half shells, removing all internal components Ground coffee feeder FIG.12 Upper filter assembly Brewing chamber assembly Dose ejecting lever Diverting slides RODS Internal handle Z-3000 var 13/10/2005 page 8 / 11

SCHEDULED MAINTENANCE OPERATIONS The brewer unit Z2000 M is very reliable; however, in order to continue to have the initial features, some basic scheduled maintenance is necessary. The number of cycles to reach before maintenance is only a guideline, as they depend on the type of coffee and its grade of grinding. 1) EVERY 3000-4000 COFFEE DISPENSED (OR AFTER 2 MONTHS OF OPERATION) REPLACE OR CLEAN THE UPPER FILTER ( TOTAL EXPECTED TIME FOR THE OPERATION IS 3 MINUTES) FIG.1 FIG.2 FIG. 3 Remove the brewer unit from the machine, disconnecting the hydraulic connections and undoing the knurled knob. Slide out the connecting rods from the upper side, so as to free the upper piston assembly; it is not necessary to open completely the unit, but only slightly deflect the half-shells to be able to extract the piston assembly. FIG. 4 FIG. 5 FIG. 6 Undo the central hexagonal head screw, holding the spring, and free the mobile piston. Undo the central filter fastening screw, remove the filter, remove the O-ring seals. Descale or replace the filter. N.B.: in any case, it is advisable to carry out all operations at the workshop and replace the components subjected to maintenance with others already cleaned and descaled previously. Z-3000 var 13/10/2005 page 9 / 11

2) EVERY 6000-8000 COFFEE DISPENSED (OR AFTER 6 MONTHS OF OPERATION) PLANNED OPERATIONS: REPLACE OR CLEAN THE UPPER AND LOWER FILTER, CLEAN THE VENT HOLE ( TOTAL EXPECTED TIME FOR THE OPERATION IS 6 MINUTES ) Fig. 1 Fig. 2 Fig. 3 Place the brewer unit on a surface and rotate the handle to the upper dead centre. Remove the seeger rings stopping the connecting rod Completely remove the upper steel connecting rod Completely undo the hexagonal head screw (using a special Allen key) Fig. 4 Fig. 5 Fig. 6 Slide out the handle wheel and remove it from its seat Undo all screws (5 pcs) of the upper half-shell and open the two half-shells to access the internal brewing chamber Fig. 5-6 Fig. 7 Fig. 8 Fig. 9 Remove the brewing chamber assembly and slide out the seeger ring in the lower part, freeing the lower piston Remove the lower piston, undo the filter fastening screw and remove the filter, remove the O-ring ( Fig. 8 9 ) Descale the filter, or if necessary replace with a new one. Clean and lubricate the O-ring with specific grease (if damaged, replace). Clean and if necessary descale the internal chamber. Reassemble all parts proceeding in the reverse order. Z-3000 var 13/10/2005 page 10 / 11

Remove the small on the body of the brewing chamber, uncovering a small hole. Such hole communicates with the lower portion of the brewing chamber Fig. 9 Using a 0.5 mm bit free from any encrustations. Clean the internal side of the body and of the brewing chamber Fig. 10 Fig. 11 Reassemble all parts, making sure to carry out the operations in the reverse order to disassembly; reassemble the upper half-shell 3) EVERY YEAR (REGARDLESS OF THE NUMBER OF SELECTIONS MADE) PLANNED OPERATIONS: REPLACE OR CLEAN THE UPPER AND LOWER FILTER, DISASSEMBLING THE BREWING CHAMBER AND COMPLETELY DESCALING AND LUBRICATING. ( EXPECTED TIME FOR THE OPERATION IS 14 MINUTES) EXPLODED VIEW OF BREWING CHAMBER COMPONENTS Fig. 13 O-ring In addition to the operations scheduled in the previous point, completely clean and ensure that all brewing chamber components are in working order. Remove the lower cover of the brewing chamber, undoing the three screws that keep it closed, making sure to hold the springs inside (it is advisable to use a holding clamp). Remove all components, paying attention to their position. Replace the O-ring, clean all parts, lubricate lightly and reassemble everything proceeding in the reverse order. When reassembling, use the clamp to compact the springs before tightening the screws Lower filter holder piston O-ring Guide bush Internal guide bush Internal spring External spring Closing flange with screws Reassemble all parts, reassemble completely the brewing chamber, refit onto the machine and make some test selections. Z-3000 var 13/10/2005 page 11 / 11