Special Interchange Design National Perception vs. Urban Reality. Traffic Engineering and Safety Conference October 14, 2015

Similar documents
FOR IMMEDIATE RELEASE Contact: Jan Kemp, ext June 29, 2009 Joelle McGinnis, ext

Illinois Asphalt Pavement Association. March 12, 2013

Rebuilding And Expanding The Illinois Tollway With Minimal Impact To The Daily Customer

IDOT and Illinois Tollway Connecting Northern Illinois Over the Years. Clarita Lao, Illinois Tollway September 29, 2017

2016 Year End Budget to Actual Review (Preliminary and Unaudited) March 23, 2017 Mike Colsch

PUBLIC NOTICE The Illinois State Toll Highway Authority Schedule of Committee Meetings April 15, 2016

PUBLIC NOTICE The Illinois State Toll Highway Authority Schedule of Committee Meetings September 11, 2015

Illinois State Toll Highway Authority - Bidder List

2016 Traffic Data Report For The Illinois Tollway System

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRAFFIC UPDATE. Prepared for:

FINDINGS AND RECOMMENDATIONS

Illinois State Toll Highway Authority Minutes of the Engineering-Planning Committee Meeting January 27, 2011

PUBLIC NOTICE The Illinois State Toll Highway Authority Notice of Committee Meetings Friday, February 9, 2018

Traffic Data Report for the Illinois Tollway System

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY Tollway Headquarters 2700 Ogden Avenue Downers Grove, Illinois 60515

Illinois State Toll Highway Authority - Bidder List

Use Of Local Aggregates In SMA. Ross A. Bentsen, P.E. Quigg Engineering Inc. November 6, 2018

DRAFT SECTION 4(F) EVALUATION FAIRVIEW CEMETERY

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY Tollway Headquarters 2700 Ogden Avenue Downers Grove, Illinois 60515

Tollways n Autumn 2008

Members. Ex-Officio Members

PART 2. SIGNS Chapter 2J. Specific Service (Logo) Signs

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY Tollway Headquarters 2700 Ogden Avenue Downers Grove, Illinois 60515

Use of Local Aggregates in SMA. Ross A. Bentsen, P.E., Quigg Engineering Inc. February 3, 2015

Illinois Tollway / ACEC-IL Liaison Committee Meeting. Illinois Tollway 2700 Ogden Avenue, Downers Grove, IL Room 219

Attachments: Memo from Lisa Applebee, ACHD Project Manager PowerPoint Slides for October 27, 2009 Work Session

The Illinois Tollway. Minutes of the Engineering-Planning Committee Meeting. May 31, 2007

How Rest Area Commercialization Will Devastate the Economic Contributions of Interstate Businesses. Acknowledgements

Preserving New Orleans Bridges

Nogales: Donation Acceptance Program

BOARD OF ZONING ADJUSTMENT STAFF REPORT Date: June 4, 2018

INTRODUCTION TO CUSTOM FABRICATED STRAINERS

The Elefsina Stavros Spata A/P motorway (ESSM), extending along approximately 51 km,

UNIVERSITY OF FLORIDA CAMPUS MASTER PLAN, : YEAR 2020 ROADWAY SYSTEM NEEDS PLAN

NWC Dallas N Tollway & Stonebrook Pkwy Frisco, Texas

FOR SALE > ARBY S. 745 W. Clover Road Tracy, CA COLLIERS INTERNATIONAL 3439 Brookside Road, Suite 108 Stockton, CA USA

2009 LUNCH TRUCK ADVERTISING COLD TRUCKS

Words shown in bold throughout this document are defined in the glossary

The restaurateur s guide to delivery

Rail Haverhill Viability Study

RIZE ONE 3D PRINTER SPEEDS PART TURNAROUND 20%, SAVES MILLIONS FOR CONSUMER PACKAGED GOODS MANUFACTURER

Uniform Rules Update Final EIR APPENDIX 6 ASSUMPTIONS AND CALCULATIONS USED FOR ESTIMATING TRAFFIC VOLUMES

Table of Contents. Contact Information

Cobb Galleria One Galleria Pkwy Suite 1B1 Atlanta, GA Party Hours Available:

4 Steps to Survive the Fast Casual Digital Ordering & Delivery Revolution

Food delivery training 101 The complete training guide for delivery excellence

SIMPLEX STRAINER MODEL 90

TITLE: AMENDMENT TO STANDISH TOWN CODE, CHAPTER 181, LAND USE PART I (ZONING)

AGENDA ITEM 2 A Action Item. Brian James, Planning and Marketing Manager. Cameron Park Route Changes with Expansion of Service to El Dorado Hills

IELTS ACADEMIC WRITING TASK 1 MAP & PROCESS

KITCHEN LAYOUT & DESIGN

McDONALD'S AS A MEMBER OF THE COMMUNITY

Food on Demand. Liz Bosone Director, Enterprise B2B Relationships, Grubhub Jon Lawrence Sr. Director of Hospitality Solutions, NCR Corporation

Waterways Suitability Assessment Process. LCDR Dan McQuate Office of Facility and Port Compliance, Facilities and Cargo Division (CG-FAC-2)

Los Patios Your Oasis in the Heart of the City

Demand, Supply and Market Equilibrium. Lecture 4 Shahid Iqbal

Consistency Starts in the Kitchen for KBP Foods

Economic and Fiscal Impacts of LiftFund:

Town of Parker Stars and Stripes Celebration FAQs

EVENT PARKING A map with directions to event parking appears at the end of this document. Parking permits will not be provided for this event.

Ideas + Action for a Better City learn more at SPUR.org. tweet about this #IsDrivingReallyFree?

CONSTRUCTION MANAGER S TRAINING QUESTIONS & ANSWERS

RESTAURANT OUTLOOK SURVEY

Restaurants, Bars and Nightclubs

Access Statement - Stadium of Light INTRODUCTION

Trends. in retail. Issue 8 Winter The Evolution of on-demand Food and Beverage Delivery Options. Content

CST SERVICES LLC Part of the CST Brands, Inc. Family of Companies

WHAT IS PARKVIEW ON PEACHTREE?

PIZZA HUT & WINGSTREET

77th OREGON LEGISLATIVE ASSEMBLY Regular Session

That Was Fun Now What? Economy in TASSCC - Austin

Acreage Forecast

Sample. TO: Prof. Hussain FROM: GROUP (Names of group members) DATE: October 09, 2003 RE: Final Project Proposal for Group Project

Ohio Department of Transportation

Demand for Commercial Heavy Truck Parking on Interstate Highways: A Case Study of I-81 in Virginia

Informing Wineries Tourism Decisions: Studies of Tasting Room Visitors and Wine Tourism Collaboration

BANKCOIN.global WHITE PAPER VER 1.6. BANKCOIN.global WHITE PAPER SEE 1.6

Franchise Opportunity

Emerging Local Food Systems in the Caribbean and Southern USA July 6, 2014

Fruit and Vegetable TRUCK RATE REPORT

COUNTY OF SONOMA PERMIT AND RESOURCE MANAGEMENT DEPARTMENT 2550 Ventura Avenue, Santa Rosa, CA (707) FAX (707)

Determining the Optimum Time to Pick Gwen

For All Campers: What to Bring: Bunking Areas: Restrooms: Orientation Films: Meals: Food Service & Big Mamie s Snack Shack Fire Drill: Activities:

Local Information for ICM-8, April 25-29, 2016, Boulder, Colorado

The Evolution of Fast Casual

Eco-Schools USA Sustainable Food Audit

Jake Bernstein Trading Webinar

Resident Student Dining Committee Minutes of Meeting

Raymond James 33 rd Annual Institutional Investors Conference March 5, DineEquity, Inc. All rights reserved.

STACKING CUPS STEM CATEGORY TOPIC OVERVIEW STEM LESSON FOCUS OBJECTIVES MATERIALS. Math. Linear Equations

IN THE TRUMBULL COUNTY COURT EASTERN DISTRICT TRUMBULL COUNTY, OHIO

Update on Student Nutrition Services Food Security Task Force October 1,

Growing a Wine Region. Ramona Valley AVA

MILLENNIAL CONSUMERS SEEK NEW TASTES, WILLING TO PAY A PREMIUM FOR ALCOHOLIC BEVERAGES. Nielsen Releases Most Comprehensive Study To Date

Take a Closer Look at Today s Polystyrene Packaging

Company name (YUM) Analyst: Roman Sandoval, Niklas Podhraski, Akash Patel Spring Recommendation: Don t Buy Target Price until (12/27/2016): $95

ARTIFACT A ARTIFACT B

NO TO ARTIFICIAL, YES TO FLAVOR: A LOOK AT CLEAN BALANCERS

The Fertile Crescent and the Promised Land

STUDY AND IMPROVEMENT FOR SLICE SMOOTHNESS IN SLICING MACHINE OF LOTUS ROOT

Transcription:

Special Interchange Design National Perception vs. Urban Reality Traffic Engineering and Safety Conference October 14, 2015

Presentation Purpose System interchanges interstate-to-interstate Myth vs. reality Future maintenance Context is important 2

Move Illinois Program TAKE CARE OF EXISTING SYSTEM NEEDS JANE ADDAMS MEMORIAL TOLLWAY $2.5 billion ELGIN O HARE WESTERN ACCESS $3.4 billion I-294/I-57 INTERCHANGE $719 million ILLINOIS ROUTE 53/120 PROJECT OTHER EMERGING PROJECTS 3

Major System Interchange Projects Tri-State Tollway (I-294) at I-57 Simplified maintenance for flyover I-290 at Illinois Route 390 Broken-back curve for flyover Tri-State Tollway (I-294) at I-190 Left-hand ramp for flyover 4

Standard System Interchange Texas-style four-level directional interchange U.S. unofficial high-end standard Generally good traffic operations 5

Texas-Style System Interchange Negatives? Large footprint Long third-, fourth- and even fifth-level bridge structures Difficult to maintain and (eventually) rebuild 6

Existing Example Jane Addams Memorial Tollway (I-90) at the Tri-State Tollway (I-294) Directional interchange built in 1958, when larger footprint was available Includes third-level directional flyover ramps 7

Long-Term Issues Tri-State Tollway (I-294) over the Jane Addams Memorial Tollway (I-90) bridge Restricts ability to expand either route Hinders ability to maintain and eventually rebuild interchange Must close active lanes 8

Existing Example Veterans Memorial Tollway (I-355) at I-55 Interchange spread out over larger footprint Only two relatively short third-level points Simple road spans Includes a loop ramp 9

Tri-State Tollway (I-294)/I-57 Interchange Flyover Ramps Cloverleaf envisioned in 1960s never built Year 2000 design similar to the Jane Addams Memorial Tollway (I-90) at the Tri-State Tollway (I-294) Implementation issues Future maintenance issues Different jurisdictions (I-57 is an IDOT roadway) Expensive third-level structures not only over roads, but also impacts adjacent residents 10

Horizontal Update Northbound I-57 to Northbound Tri-State Tollway (I-294) Similar to flyover ramps at Veterans Memorial Tollway (I-355) and I-55 Shorter spans of mainlines Bridges moved outside of mainline Simplified future maintenance 11

Vertical Update Northbound I-57 to Northbound Tri-State Tollway (I-294) Ramp redesigned to span the Tri-State Tollway (I-294) and then go under I-57 Never higher than second level (I-57) Reduced flyover length Simpler spans Reduced residences impacts 12

Positives and Negatives Reduced construction impacts to interstates Bridge lengthened to span drainage area Still less expensive than original bridge structure Reduced approach and departure grades Important in winter weather regions 13

Present Value Cost Savings Reduced limits on the North Tri-State Tollway (I-294) Reduced property acquisition (half) Massive reduction in fill requirements More than 10 percent initial construction bid savings Simplicity savings not included Long-term maintenance Plus right-of-way (ROW) and social savings 14

Tolling? Original toll plaza north of 147 th Street Tolls require acceleration and deceleration from cash lanes Design updated to I-PASS or Pay Online Tolling Cash customers can pay online in seven days Allows for free-flowing design parameters Further reduced the Tri-State Tollway (I-294) footprint 15

Conclusion Opened in November 2014 Higher-than-expected initial usage Positive user feedback 16

I-290 Interchange at Illinois Route 390 Existing interchange with Thorndale Avenue includes signalized I-290 exit ramps Heavy Illinois Route 390 truck demand Queuing on I-290 exit ramps All movements to remain open during construction, complicating alternatives 17

Broken-Back Curves Two successive horizontal curves in the same direction with a short tangent between them Per AASHTO DON T CONSTRUCT THEM! The broken-back arrangement of curves should be avoided except where very unusual topographical or ROW conditions make other alternatives impractical most drivers do not expect successive curves to be in the same direction are not pleasing in appearance compound curve alignment preferable. All right if the connecting tangent is of considerable length. Even in this case, the alignment may be unpleasant in appearance when both curves are clearly visible for some distance ahead. 18

Early EIS Design Three flyovers, including fourth-level flyover ramp for eastbound Illinois Route 390 to northbound I-290 19

Tolling? Illinois Department of Transportation (IDOT) originally analyzed as free road Adding tolls on Illinois Route 390 reduced 2040 traffic Tolling generally removes short-distance trips Removes some weaving between ramps Reduced need for directional ramps 20

Updated Tollway Design Illinois Route 53 updated to span Illinois Route 390 Reduced fill for mainline Simplified mainline construction Eastbound Illinois Route 390 to northbound I-290 updated as loop ramp Existing movement is loop ramp New collector-distributer road allows for proper deceleration New toll road connecting the Jane Addams Memorial Tollway (I-90) and the Tri-State Tollway (I-294) on the west side of O Hare, reducing traffic 21

I-290 to Illinois Route 390 Flyover Ramps Flyovers from I-290 to Illinois Route 390 remain Westbound I-290 to westbound Illinois Route 390 has highest traffic Lessons learned from the Tri-State Tollway (I-294)/I-57 Interchange Project Avoid building a flyover over other bridges Reduce span lengths over mainlines Build as much of the ramp outside of existing facilities as possible for ease of construction 22

Current Flyover Design 23

Westbound I-290 to Westbound Illinois Route 390 Ramp Existing residences on the southeast quadrant Additional room available on the northwest quadrant Only third-level structures required Able to avoid fourth-level structure Reduce span length over I-290 Span length impacts bridge type and cost Increases beam height, impacting ramp profile 24

Details Shifted entire ramp farther west More room for southbound flyover ramp west of I-290 Piers located outside of existing Thorndale Avenue Requires additional same-direction curve Consistent cross slope to west no rotation Aesthetics? (I think its beautiful) 25

Conclusion Opened in July 2015 Positive driver feedback Avoiding delays at signal is main feedback No one notices a broken-back curve, since there is ample distance between curves 26

Westbound I-190 to Southbound Tri-State Tollway (I-294) Existing left-hand ramp that spans the CTA and eastbound I-190 Complicated approach to airport with less-thanstandard interchange spacing Should left side ramp remain when reconstructed? 27

Left-Hand Ramps Guidance Per AASHTO DON T CONSTRUCT THEM! Left-hand ramps are contrary to the concept of driver expectancy when intermixed with right-hand ramps avoid left-hand exits in the design of interchanges Left-side ramp terminals break up the uniformity of interchange patterns and generally create uncertain operation on through roadways Left-hand ramps are considered satisfactory for collectordistributor roads use on high-speed, free-flow ramps is not recommended Special attention should be given to signing and decision distance to alert the driver that an unusual situation exists 28

Right Reasons? Driver expectancy drivers have been taught that access is on the right side Weaving exiting traffic would have to weave through mainline lanes High-speed left lane slower traffic should stay right adjacent to access ramps Future widening rural interstates are typically widened to center Safety HSM approximately 50 percent reduction stat 29

HSM Data? The Marquette Interchange removed left-hand ramps and reduced crashes by approximately 50 percent Is this the basis of the HSM stat? Marquette Interchange was a $700+ million project that also added lanes, reconstructed pavement and consolidated access Is the entire reduction in crashes attributed to removing the left-hand ramps? 30

Are Left-Hand Ramps an Option? Exiting mainline instead of entering? If approach speed is lower? If car-only facility? Ample decision distance and signage? In-car technology improvements? If right-side exit has inferior operations? 31

Positives of Left-Hand Exit Ramps Cost savings of reducing structure lengths Avoids overloading of right side of interstate Can reduce weaving on mainline 32

Major System Divergences Two-sided major divergence includes a left-hand movement for one of the mainlines With proper signage and decision distance, major route can be left or right 33

Dan Ryan Expressway Express and Local Lanes Separate express lanes on left for cars only Half of the movements via left ramps 34

Kennedy Expressway Reversible Lanes Barrier separated car-only express within interstate Changes direction by the time of day Majority of connections are on left side 35

National Multi-Billion Dollar Projects Nearly every major managed-lanes project includes leftside ramp connections Houston Katy Freeway (~$3 billion) DC Capital Beltway (>$2 billion) Atlanta I-75 Reversibles (~$1 billion) Orlando I-4 (~$3 billion) Dallas North Tarrant Express (<$4 billion) Miami I-595 Reversibles (~$2 billion) Also multiple new/recent projects near Seattle, San Francisco, Los Angeles, San Diego, Denver, Tampa Bay, Austin, San Antonio and North Carolina 36

Context for I-190 Interchange I-190 begins one mile east of the location Trucks already in I-190 left lane (I-90 Lane 3) 37

Approach to Ramp Northbound Tri-State Tollway (I-294) to westbound I-190 ramp to be restricted Right-side flyover ramp would require heavy weaving and additional lanes with this ramp 38

Actual Exit Includes left-side auxiliary lane prior to exit Simple span over CTA and eastbound I-190 39

Conclusion Left-hand ramp is proposed Span length reduced by more than 50 percent Additional approach signage provided Downstream merge onto southbound the Tri-State Tollway (I-294) on the right 40

Any Questions? Happy 9th birthday, Addison! 41