Details of construction contracts/pmc under CPM/Bangalore February-2009 to till date (11.12.2012) Sl. 1 TGT / PMC / Package- 1 Construction of Roadbed, Major And Minor Bridges and Track S&T General Electrical Works in Connection With 1/01 dt.15.03.2012 Harlapur(Including)- Km 143.22 To 74.000, on Hubli Division of South Western Railway in Bellary, Koppal & Gadag Districts in Karnataka State, India 47,403,460.00 Yes (24.03.2012) 2 TGT / PMC / Package- 2 Construction of Roadbed, Major and Minor Bridges and Track S&T General Electrical Works In Connection With Hebsur(Including)- Km 74.000 To 18.970 and Hubli (Including) To Dharwad (Including) Km 469.00 To Km 489.09 in Hubli Division of South Western Railway in Gadag and Dharwad Districts in 2/02 dt.15.03.2012 50,436,620.00 Yes (24.03.2012) 3 TGT / PMC / Package- 3 Construction of Roadbed, Major and Minor Bridges and Track S&T General Electrical Works in Connection with (Including) Km 514.270 To Km 559.450 And Londa 3/03 dt.16.02.2012 To Tinaighat Km 0.00 To Km 13.200 in Hubli Division of South Western Railway in Dharwad, Belgaum and Karwar Districts in Karnataka State, India. M/s STUP Consultants Pvt. Ltd., Temple Tower, 7th floor, 672, Anna Salai, Nandanam, Chennai-600035 50,150,960.00 Yes (24.03.2012)
4 5 TGT/Main tender/package-1 TGT/Main tender/package-2 Construction of Roadbed, Major And Minor Bridges Sleepers) S&T General Electrical Works in Connection With Harlapur(Including)- Km 143.22 To 74.000, on Hubli Division of South Western Railway in Bellary, Koppal & Gadag Districts in Karnataka State, India Bridges Sleepers) S&T General Electrical Works In Connection With Hebsur(Including)- Km 74.000 To 18.970 and Hubli (Including) To Dharwad (Including) Km 469.00 To Km 489.09 in Hubli Division of South Western Railway in Gadag and Dharwad Districts in ge-1/05 dt.07.08.2012 ge-2/06 dt.26.07.2012 M/s. Larsen & Toubro Limited ECC Division (Engineering) Construction and Contractors, Mount Poonamallee Road, Manapakkam, P.B.979, Chennai- 600 089 M/s Railone-Tarmat-Durga (JV) 339, Arora Colony-II, Road 3 Banjara Hills, Hyderabad- 500 034 1,655,544,879.00 Yes (26.06.2012) 1,491,724,879.00 Yes (26.06.2012) 6 TGT/Main tender/package-3 Bridges Sleepers) S&T General Electrical Works in Connection with (Including) Km 514.270 To Km 559.450 And Londa To Tinaighat Km 0.00 To Km 13.200 in Hubli ge-3/07 dt.26.07.2012 Division of South Western Railway in Dharwad, Belgaum and Karwar Districts in Karnataka State, India. M/s GVR-GEW (JV) VBC Solitaire, 47 & 49, 9th Floor,Bazullah Road, T.Nagar, Chennai-600 017 1,347,906,524.00 Yes (26.06.2012)
7 RVNL/Bangalore/CLR- QLM/FLS/OT/04 dt. 11.6.2012 CONSULTANCY SERVICES FOR Development of New alignment including refinements, Geological & Geophysical,mapping, final location survey, site investigation, preparation of detailed plans & section, yard plans, staking centre line., general arrangement drawings of tunnels, viaducts, major and minor bridges, survey of S&T and general electrical works, preparation of detailed estimate. BOQ and misc. works for new line bet. existing chainage 26.45 km to existing chainage 49.500 km from Castlerock (excluding) Kulem(excluding) section (approximately 34.8km) long of Tinaighat-Vasco-da- gama doubling project on South Western Railway in Uttar Kannada District of state of Karnataka and South Goa District in the state of GOA (India) RVNL/SBC/CLR/QLM/ FLS/04/LOA dt.01.11.2012 M/s AECOM Asia Company Ltd., 3rd Floor, Tower-8A, Infinity Tower-C, DLF Cyber City, DLF-Phase-2 Gurgaon- 122002 4,08,88,496.00 Yes (01.11.2012)
Details of Contracts placed upto the month of Sept-2012 under CPM/Bangalore. Sl. Tender of opening Estimated cost (In Tendered cost (in Scheduled date of completion 1 Construction of Roadbed, Major And Minor Works in Connection With 1/01 dt.15.03.2012 Harlapur(Including)- Km 143.22 To 74.000, on Hubli Division of South Western Railway in Bellary, Koppal & Gadag Districts in Karnataka State, India 46,465,014.00 47,403,460.00 2 Works In Connection With Hebsur(Including)- Km 74.000 To 18.970 and Hubli (Including) To Dharwad (Including) Km 469.00 To Km 489.09 in Hubli Division of South Western Railway in Gadag and Dharwad Districts in 2/02 dt.15.03.2012 50,140,014.00 50,436,620.00 3 Works in Connection with 3/03 (Including) Km 514.270 To Km 559.450 And dt.16.02.2012 Londa To Tinaighat Km 0.00 To Km 13.200 in Hubli Division of South Western Railway in Dharwad, Belgaum and Karwar Districts in M/s STUP Consultants Pvt. Ltd., Temple Tower, 7th floor, 672, Anna Salai, Nandanam, Chennai-600035 46,465,014.00 50,150,960.00 4 Construction of Roadbed, Major And Minor Works in Connection With ge-1/05 Harlapur(Including)- Km 143.22 To 74.000, dt.07.08.2012 on Hubli Division of South Western Railway in Bellary, Koppal & Gadag Districts in Karnataka State, India M/s. Larsen & Toubro Limited ECC Division (Engineering) Construction and Contractors, Mount Poonamallee Road, Manapakkam, P.B.979, Chennai- 600 089 1,548,277,265.00 1,655,544,879.00
Tender of opening Estimated cost (In Tendered cost (in Scheduled date of completion 5 Works In Connection With Hebsur(Including)- Km 74.000 To 18.970 and Hubli (Including) To Dharwad (Including) Km 469.00 To Km 489.09 in Hubli Division of South Western Railway in Gadag and Dharwad Districts in ge-2/06 dt.26.07.2012 M/s Railone-Tarmat-Durga (JV) 339, Arora Colony-II, Road 3 Banjara Hills, Hyderabad- 500 034 1,666,169,897.00 1,491,724,879.00 6 Works in Connection with (Including) Km 514.270 To Km 559.450 And ge-3/07 Londa To Tinaighat Km 0.00 To Km 13.200 in dt.26.07.2012 Hubli Division of South Western Railway in Dharwad, Belgaum and Karwar Districts in M/s GVR-GEW (JV) VBC Solitaire, 47 & 49, 9th Floor,Bazullah Road, T.Nagar, Chennai-600 017 1,427,492,135.00 1,347,906,524.00