Implementation Status & Results Vietnam Natural Disaster Risk Management Project (P073361)

Similar documents
Implementation Status & Results Vietnam Second Rural Energy Project (P074688)

Implementation Status & Results Vietnam System Efficiency Improvement, Equitization & Renewables Project (P066396)

Implementation Status & Results Vietnam Second Rural Energy Project (P074688)

Implementation Status & Results Vietnam System Efficiency Improvement, Equitization & Renewables Project (P066396)

DANH SÁCH THÍ SINH DỰ THI IC3 IC3 REGISTRATION FORM

WINE & DINE OFFERS. Merchant Offer Photo Validity Outlet

WINE & DINE OFFERS. Merchant Offer Photo Validity Outlet. 5% off total bill Til 01/10/2017

Countries» Sourcing From Guides» About» Contact us

Explore the hidden charm of Vietnam. With merchant privileges powered by Visa

The W Gourmet mooncake gift sets are presently available at:

PREMIER VILLAGE PHU QUOC RESORT

ART OF CEILINGS. Classic ceilings dry walls

Places to eat in Westminster, CA

KHAI VỊ - APPETIZERS PHỞ BÒ BEEF NOODLE SOUP

VIETNAM AND THE EFFECT OF COMPACT FLUORESCENT LAMP AS A REPELLENT

29/07/2012. Phisyco-chemical properties and current postharvest practices on main fruits varieties in the South of Vietnam

REHABILITATION AND CONSERVATION OF NYAPALMS

Survey and Information Collection on Surimi Industry and catch data in Vietnam, June 2006

CENTRAL AMERICA COFFEE RUST ACTION PLAN 2013 Component 1 Integrated Coffee Rust Management. LEADERS and PARTICIPANTS

Beef Rice Noodle Soup -Pho-

2. The proposal has been sent to the Virtual Screening Committee (VSC) for evaluation and will be examined by the Executive Board in September 2008.

Các bước trong phân khúc thi truờng. Chương 3Phân khúc thị trường. TS Nguyễn Minh Đức. Market Positioning. Market Targeting. Market Segmentation

Bài 15: Bàn Thảo Chuyến Du Ngoạn - cách gợi ý; dùng từ on và happening

Viet Deli Today MENU. Hanoian grilled. Deep fried crispy pork belly. and aroma salsa. - Gillian Anderson -

SUSTAINABLE COFFEE PROGRAM Vietnam February 2014

ED 1957/05. 1 July 2005 Original: English. Development of and prospects for the Vietnamese coffee industry

Vietnamese Song Booklet

PJ 53/ August 2013 English only. Report of the Virtual Screening Subcommittee (VSS) on three coffee project proposals

Shrimp & Pork Rolls (2 Rolls) - Rice Flour crepes /w. Vietnamese f ried Rice Flour crepes /w Bean Sprouts, Onion, Shrimp, and Pork

Can fruit revitalize HAG?

west australian wine industry sustainable funding model

Our culinary team wishes you chúc quý khách ngon miệng (bon appétit).

5000 Central Ave. S.E. Albuquerque, NM (505) Thức Uống -Beverages

A1. SPRING ROLLS PORK / CHICKEN / PRAWN (8 ROLLS) 8.50

COMBINATION MEALS. (No substitutions please) NO. 4 $18

The Hanoi. Your Favorite Traditional Vietnamese Cuisine in Sydney OPEN 7 DAYS. Mon Sat: 11 am - 9 pm, Sunday: 4 pm - 9 pm

INTRODUCTION OF MATERIAL SOURCES DAKLAK CHEER FARM

VIETNAMESE COFFEE REPORT

Executive Chef and his culinary team have tailor-made this menu showcasing favorite regional cuisine and a wide selection of western dishes.

Discovery Indochina Your Way!

KHAI VI - APPETIZERS. BO LA LOT (3 pcs): Grilled marinated beef and pork wrapped in an aromatic Hawaiian leaf.

Chicken Noodle Soup Pho Ga It is a national dish. Special family recipe has been popular in Hanoi for three generations.

restaurant menu Ordering Vietnamese Food

Financial Results for Q3 Fiscal Year Ending December 31, 2018 November 5, 2018 Suntory Beverage & Food Limited

VIETNAM VEGETABLE AND FRUITS

SAVOR MID-AUTUMN FESTIVAL WITH HILTON

Preface Introduction reference for trainers We want your help

GT Chä Giò 2. Fresh Shrimp Salad Rolls (3) GÕi CuÓn Tôm 3. Grilled Lemon Grass Chicken Salad Rolls (3)

Proposed amendments. Third meeting of the Working Group on the Trans-Asian Railway. Document E/ESCAP/TARN/WG(3)/2.

Parameters Effecting on Head Brown Rice Recovery and Energy Consumption of Rubber Roll and Stone Disk Dehusking

Executive Chef Moreno and his culinary team have tailor-made this menu showcasing favorite regional cuisine and a wide selection of western dishes.

REPORT. Scoping study on commercial vegetable production in Son La and Dien Bien. FOR THE PROJECT ENTITLED HUMIDTROPICS, A CGIAR RESEARCH PROGRAM

PHÁT TRIỂN ỨNG DỤNG WEB

Status Report on CFC funded Project in India

Savor Mid-Autumn Treasures at Hilton Hanoi Opera! Gìn giữ nét đẹp cổ truyền

NHÀ HÀNG SEN VIỆT THỰC ĐƠN BUFFET Áp dụng từ 1/10/2017

FOOD MENU FOR M ORE IN FO, N EWS A N D OFFERS FOLLOW U S ON /M IEN TAY RES TAU RA N IEN _TAY

DO YOU GROW OR BUY WINE GRAPES, AND MAKE WINE FROM IT?

1-5/34 Wright Street, Ferryden Park, SA maikitchen.com.au

DEMAND TREND, MARKET, PRICE DEVELOPMENT AND PROMOTIONAL REQUIREMENTS FOR DRAGON FRUIT

ABSTRACT VẬT LIỆU VÀ PHƯƠNG PHÁP NGHIÊN CỨU. Vật liệu nghiên cứu

MÓN ĂN ĐẶC BIỆT / CHEF SPECIAL. PHở / VIETNAMESE STYLE RICE NOODLE SOUP

The Development of the Pan-Pearl River Delta Region and the Interaction Between the Region and Taiwan

City Stay Vietnam. Saigon Half Day Ho Chi Minh City Walking Tour. Inclusions of City Stay. Half Day in the Life of Chinatown. Half Day Cyclo City Tour

Pepper Crop Report 2017

STARTERS - MÓN KHAI VỊ SALADS - GỎI SOUPS - SÚP (N) (N) (N) Nem chiên cuốn tôm nấm (N) (P) (P) (N)

Response to Reports from the Acadian and Francophone Communities. October 2016

CHƯƠNG I. TỔNG QUAN VỀ HỆ THỐNG DCS- CENTUM CS 3000

Tour dates for BUCKWHEAT FLOWER SEASON

Current Status of Asian Elephants in Vietnam

MENU WEEK 1- AMERICAN INTERNATIONAL SCHOOL 01 JUNE 2018

WELCOME TO MIEN TAY OPENING HOURS. Monday to Thursday. LUNCH : from 12.00pm pm DINNER : from 5.00pm pm. Friday and Saturday

SMALLHOLDER TEA FARMING AND VALUE CHAIN DEVELOPMENT IN CHINA

PHở / VIETNAMESE STYLE RICE NOODLE SOUP

DRINKS MENU.

CHEF S SIGNATURE CREATIONS

VIETNAM COFFEE MARKET REPORT Q1/2018

WS Atkins plc (ATK) - Financial and Strategic SWOT Analysis Review

NO MSG. Business Hours: Mon - Thu: 11:00am - 9pm Fri - Sat: 11:00am - 10pm Sun: 4:00pm - 9:00pm

HANDICRAFT AND AGRICULTUAL DISTRIBUTOR

DO YOU GROW WINE GRAPES, MAKE WINE OR PARTNER WITH THE WINE INDUSTRY?

Update on ASEAN Steel Industry Development Scenario

Places to eat in Garden Grove, CA

Taste of Vietnam. Appetizers/ Khai vị. Papaya salad with tiger prawn, squid, Mussel, fried shallot and light dipping sauce 200. Gỏi hải sản nha trang

NATIVE ADS. Apply from 01/03/2017 to 31/12/2017

Productivity. Farm management. Third

Networkers Business Update. December 2014

donors forum: Project development/ funding AND Partnership Fair

WP Board 1035/07. 3 August 2007 Original: English. Projects/Common Fund

Importance and key factors for success of cashew sector in Vietnam. Le Quy Kha, DDG, Institute of Agricultural Sciences for Southern Vietnam

APPERTIZERS AU LAC SPRING ROLLS - CHA GIO AU LAC

Breakfast Buổi sáng 000,VND

1) What proportion of the districts has written policies regarding vending or a la carte foods?

Improving Enquiry Point and Notification Authority Operations

CHẤT LƯỢNG MÔI TRƯỜNG NƯỚC BIỂN VEN BỜ ĐẢO PHÚ QUỐC

Fairtrade Designation Endorsement

Coffee prices maintain downward trend as 2015/16 production estimates show slight recovery

Coffee Supply Chain IN VIETNAM

Appetizers. F. House Salad $ 4.95 Iceberg lettuce, cucumbers, tomatoes, pickled carrots & daikon in our house salad dressing.

ITINERARY (As at 12 September 2017)

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Vietnam Natural Disaster Risk Management Project (P073361) Operation Name: Natural Disaster Risk Management Project (P073361) Project Stage: Implementation Seq.No: 12 Status: ARCHIVED Archive Date: 31-Dec-2013 Country: Vietnam Approval FY: 2006 Product Line: IBRD/IDA Region: EAST ASIA AND PACIFIC Lending Instrument: Adaptable Program Loan Implementing Agency(ies): Key Dates Board Approval Date 15-Sep-2005 Original Closing Date 30-Jun-2010 Planned Mid Term Review Date 11-Jun-2007 Last Archived ISR Date 29-Jul-2013 Effectiveness Date 30-May-2006 Revised Closing Date 31-Dec-2013 Actual Mid Term Review Date 11-Jun-2007 Project Development Objectives Project Development Objective (from Project Appraisal Document) The project development objectives are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to : (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Component(s) losure Authorized Public Disclosure Authorized Component Name Component Cost Prevention and Mitigation Investments 73.70 Community-based disaster risk management 1.00 Post-disaster Reconstruction Support 95.80 Project Management and Institutional Strengthening 12.00 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Implementation Status Overview Overall implementation towards achievement of the project development objectives (PDOs) is moderately satisfactory because among three key project outcome indicators, only two outcome indicators: (a) establishment of comprehensive disaster risk management framework, and (c) strengthening Central Committee for Flood and Storm Control have been fully met. An institutional framework for disaster management framework (e.g. National Strategy for Natural Disaster Prevention, Response and Mitigation to 2020) has been established, Page 1 of 11

approved, and is functional at National and Provincial levels. A comprehensive investment plan for DRM has been developed (after extensive training on disaster risk management and analytical training in e.g. hydrological modeling, Geographical Information System and mapping for the 17 project provinces), and is being implemented. Awareness of disaster management has also been increased through the community based disaster risk management (CBDRM) and integration of DRM into education curricula. Further, the project has also helped to sharpen and disseminate the damage and needs assessment (DANA), which is a tool to assess damages and help post disaster reconstruction. The outcome indicator: (b) increase the efficiency of post-disaster recovery and reconstruction efforts has been only partially achieved. Additional financing (AF) of US$ 75 million has supported scaling up post-disaster reconstruction under Component 3 of the original project. These activities have closed the funding gaps for post-disaster reconstruction of public infrastructure, including schools, health facilities, road, bridges, water and sewerage infrastructures, canals, dykes and pumping stations, which were seriously damaged by storms and floods during 2008-2012. Since the start of the NDRMP s implementation, post-disaster reconstruction has gone through five cycles of post-disaster reconstruction (2008 2012). However, on average the fund allocation took about 8 14 months for each cycle, whereas the project targets the completion of both fund allocation and reconstruction processes within 12 months. Technical assistance was provided to review current practices and proposed an improved mechanism for the post disaster reconstruction. The consultant s findings will be presented to government at national and provincial levels at the project closing workshop in December, 2013. Locations Country First Administrative Division Location Planned Actual Vietnam Tinh Nghe An Tinh Nghe An Vietnam Tinh Ninh Thuan Tinh Ninh Thuan Vietnam Tinh Vinh Long Tinh Vinh Long Vietnam Tinh Thanh Hoa Yen Phong Vietnam Not Entered Yen Lac Vietnam Tinh Kien Giang Xom Ta Lua Moi Vietnam Not Entered Kinh Xa No Vietnam Tinh Tien Giang Kinh Xang Vietnam Not Entered Vung Liem Vietnam Tinh An Giang Vinh Trach Vietnam Not Entered Kinh Vinh Te Vietnam Tinh An Giang Vinh Te Vietnam Tinh Vinh Long Vinh Long Vietnam Tinh An Giang Vinh Hanh Vietnam Not Entered Socialist Republic of Vietnam Vietnam Not Entered Song Vam Co Tay Page 2 of 11

Country First Administrative Division Location Planned Actual Vietnam Not Entered Song Vam Co Dong Vietnam Not Entered Kinh Tri Ton Vietnam Tinh Tien Giang Tinh Tien Giang Vietnam Tinh Thua Thien-Hue Tinh Thua Thien-Hue Vietnam Not Entered Kinh Thot Not Vietnam Thanh pho Ho Chi Minh Thanh pho Ho Chi Minh Vietnam Tinh Thanh Hoa Tinh Thanh Hoa Vietnam Not Entered Kinh Thac Lac Vietnam Tinh Kien Giang Tan Hoi Vietnam Not Entered Cua Sot Vietnam Not Entered Prek Kraom Vietnam Tinh Dong Thap Rach Sa Rai Vietnam Tinh An Giang Nui Sap Vietnam Tinh Dong Thap Sa Dec Vietnam Not Entered Kinh Rach Gia di Long Xuyen Vietnam Tinh Kien Giang Rach Gia Vietnam Tinh Quang Tri Tinh Quang Tri Vietnam Tinh Quang Ngai Tinh Quang Ngai Vietnam Tinh Quang Binh Tinh Quang Binh Vietnam Tinh Phu Yen Tinh Phu Yen Vietnam Not Entered Kinh tu Phu No den Ke Sach Vietnam Not Entered Kinh Nguyen Van Tiep Vietnam Not Entered Rach My Chanh Vietnam Not Entered Song Mang Thit Vietnam Tinh An Giang Luong Phi Page 3 of 11

Vietnam Tinh Long An Luong Hoa Vietnam Tinh Long An Tinh Long An Vietnam Tinh Kien Giang Kien Luong Vietnam Tinh Kien Giang Tinh Kien Giang Vietnam Tinh Khanh Hoa Tinh Khanh Hoa Vietnam Tinh Dong Thap Hong Ngu Vietnam Tinh Ha Tinh Tinh Ha Tinh Vietnam Thu Do Ha Noi Ha Noi Vietnam Tinh Can Tho Tinh Can Tho Vietnam Tinh Binh Thuan Tinh Binh Thuan Vietnam Tinh Long An Kinh Gay Vietnam Tinh Long An Kinh Duong Van Duong Vietnam Tinh Dong Thap Kinh Dong Tien Vietnam Tinh Dong Thap Tinh Dong Thap Vietnam Tinh Dong Thap Kinh Cong Hoa Vietnam Not Entered Rach Can Tho Vietnam Tinh An Giang Rach Can Thao Vietnam Not Entered Rach Cai Von Vietnam Not Entered Cai Nhum Vietnam Tinh Long An Kinh Bo Bo Vietnam Tinh Long An Binh Thanh Vietnam Tinh Binh Dinh Tinh Binh Dinh Vietnam Tinh Ben Tre Tinh Ben Tre Vietnam Tinh Tien Giang Rach Ba Rai Vietnam Tinh Long An Kinh Bac Dong Page 4 of 11

Vietnam Tinh An Giang Ap Vinh An Vietnam Tinh Tien Giang Ap Thap Muoi Vietnam Tinh Tien Giang Ap Phu My (2) Vietnam Tinh An Giang Ap Phu Binh Vietnam Tinh Dong Thap Ap My Hoa (1) Vietnam Tinh An Giang Ap Binh Phu Vietnam Tinh An Giang Ap Ba Chuc Vietnam Tinh An Giang Ap An Thanh Vietnam Not Entered Ap An Phuoc Vietnam Tinh Dong Thap An Phong Vietnam Tinh An Giang Tinh An Giang Vietnam Tinh Ben Tre Huyen Ba Tri Vietnam Tinh Tien Giang Huyen Cai Lay Vietnam Tinh Tien Giang Huyen Cai Be Vietnam Tinh Vinh Long Huyen Long Ho Vietnam Tinh Vinh Long Huyen Tam Binh Vietnam Tinh Vinh Long Huyen Binh Minh Vietnam Tinh Vinh Long Huyen Vung Liem Vietnam Tinh Vinh Long Huyen Tra On Vietnam Tinh Can Tho Huyen Chau Thanh Vietnam Tinh Can Tho Huyen O Mon Vietnam Tinh Can Tho Huyen Thot Not Vietnam Tinh Can Tho Huyen Phung Hiep Vietnam Tinh Dong Thap Huyen Chau Thanh Vietnam Tinh Dong Thap Huyen Lai Vung Page 5 of 11

Vietnam Tinh Dong Thap Huyen Cao Lanh Vietnam Tinh Dong Thap Huyen Thap Muoi Vietnam Tinh Dong Thap Huyen Thanh Binh Vietnam Tinh Dong Thap Huyen Tam Nong Vietnam Tinh Dong Thap Huyen Hong Ngu Vietnam Tinh Dong Thap Huyen Tan Hong Vietnam Tinh Kien Giang Huyen Hon Dat Vietnam Tinh Long An Thi Xa Tan An Vietnam Tinh Long An Huyen Ben Luc Vietnam Tinh Long An Huyen Thanh Hoa Vietnam Tinh Long An Huyen Duc Hue Vietnam Tinh Long An Huyen Moc Hoa Vietnam Tinh Long An Huyen Tan Hung Vietnam Tinh Long An Huyen Vinh Hung Vietnam Tinh Nghe An Huyen Thanh Chuong Vietnam Tinh Nghe An Huyen Quynh Luu Vietnam Tinh Thanh Hoa Huyen Yen Dinh Vietnam Tinh Quang Tri Huyen Hai Lang Vietnam Tinh Quang Binh Huyen Bo Trach Vietnam Tinh An Giang Thi Xa Long Xuyen Vietnam Tinh An Giang Huyen Thoai Son Vietnam Tinh An Giang Huyen Cho Moi Vietnam Tinh An Giang Huyen Phu Tan Vietnam Tinh An Giang Huyen Chau Phu Vietnam Tinh An Giang Huyen Tri Ton Page 6 of 11

Vietnam Tinh An Giang Huyen Tinh Bien Vietnam Tinh Quang Nam Tinh Quang Nam Vietnam Tinh Quang Nam Huyen Nui Thanh Vietnam Tinh Binh Thuan Huyen Bac Binh Vietnam Tinh Ha Tinh Huyen Cam Xuyen Vietnam Tinh Ha Tinh Huyen Huong Son Vietnam Tinh Quang Ngai Huyen Duc Pho Vietnam Tinh Thua Thien-Hue Thanh Pho Hue Vietnam Tinh Thua Thien-Hue Huyen Quang Dien Vietnam Hau Giang Hau Giang Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target The Vietnamese Government establishes and implements a comprehensive disaster risk management framework for natural disaster prevention, preparedness, mitigation and recovery. Central Committee for Flood and Storm Control including its Disaster Management Center has been strengthened Text Value Referred to the Government Strategy and Action Plan for Mitigating Water Disaster was prepared and adopted in 1994. Date 16-Aug-2005 Text Value Weak capacity of central and provincial agencies in formulating strategic plans toward disaster risk management investments Date 16-Aug-2005 The project provided series of training on different subjects relating to disaster risk management to staff members of GOV line ministries who are also 01-Feb-2012 Target fully achieved Target fully achieved The strategy, including its implementation plan and the CBDRM program are approved, and being implemented Target fully achieved CCFSC and DMC fully functional and effective. Target fully achieved Page 7 of 11

members of CCFSC and provinces Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Percentage of completed sub-projects Percentage Value withstanding subsequent disaster events of the Date 17-Jul-2010 12-Nov-2013 same type of hazard up to the intensity of a 1- in-30 year event There were no damageto the reconstructured public infrastructure after the recent typhoon Wutip, Nari and Haiyan in 2013 Length of time from the date of release of funds Days Value to the relevant provinces to completion of subprojects; Date 12-Nov-2013 A consultant has been carrying a review of the current practices and procedures for the post disaster reconstruction. It s expectedthat the first draft report will be circulated by end of November to relevant agencies at national and subnational levels and the Bank for review. The consultant s finding and recommendations will be presented at the AF Completion Workshop in December Detailed needs assessment for the Text Value establishment of an Emergency Management Date 12-Nov-2013 Center completed A detailed needs assessment Detailed needs assessment for the establishment of an for the establishment of an Emergency Management Emergency Management Center completed was. Center approved Instead of establishing the Emergency Management Center, government established a department level Disaster Management Centre (DMC) in early 2010. Page 8 of 11

Number of provinces with completed Natural Disaster Mititgation Investment Plans Percentage of people in targeted communities (e.g. Mekong Delta) reporting improved early warning of floods and storms Number of feasibility studies completed for sub-subprojects to be funded under the program Number of sub-projects completed DMC is a part of the CCFSC s Standing Office that is responsible for DRM including emergency response and relief Text Value 0 12 provincial integrated NDRM investment planning are prepared and being implemented. Date 16-Aug-2005 Target fully achieved Target fully achieved Text Value 0 100% of project communes are accessible to early warning of floods and storms. Date 16-Aug-2005 12-Jun-2013 Substantially met the target. The installation of the hydromet equipment has been largely completed before the completion date. After project completion, with the counterpart funds, the contract was completed. The system is now fully operational the hydromet system functional and target met. Text Value 0 13 feasibility studies completed and to be funded by the project. Date 16-Aug-2005 Fully met the target. Fully met the target. Number of Safer Commune Plans prepared Text Value 0 30 communes who are disaster prone have completed the preparation of Safer Commune Plans. Date 16-Aug-2005 Fully meet the target 29-Jun-2013 Fully meet the target Page 9 of 11

(i) Procedures for Damage Assessment are revised; (ii) Measurable criteria approved for prioritizing allocation of post-disaster assistance Detailed needs assessment for the establishment of an Eme Data on Financial Performance (as of 07-Nov-2013) Text Value n/a (i) Procedures for Damage Assessment are revised; (ii) Measurable criteria approved for prioritizing allocation of post-disaster assistance. Date 16-Aug-2005 none completed 12-Nov-2013 Work related to the second indicator has been started and will be completed in December, 2013. 31-Dec-2013 Financial Agreement(s) Key Dates Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P073361 IDA-41140 Closed 15-Sep-2005 02-Mar-2006 30-May-2006 30-Jun-2010 28-Jun-2012 P073361 IDA-47700 Effective 17-Jun-2010 09-Aug-2010 08-Nov-2010 31-Dec-2013 31-Dec-2013 P073361 TF-54753 Closed 02-Mar-2006 02-Mar-2006 02-Mar-2006 30-Jun-2008 31-Mar-2009 P073361 TF-55176 Closed 02-Mar-2006 02-Mar-2006 30-May-2006 30-Jun-2010 P073361 TF-57258 Closed 07-Mar-2007 07-Mar-2007 07-Mar-2007 30-Jun-2010 30-Jun-2011 Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P073361 IDA-41140 Closed USD 86.00 83.69 2.31 88.56 0.00 106.00 P073361 IDA-47700 Effective USD 75.00 75.00 0.00 73.98 2.27 99.00 P073361 TF-54753 Closed USD 1.46 1.38 0.08 1.38 0.00 100.00 P073361 TF-55176 Closed USD 4.50 3.98 0.52 3.98 0.00 100.00 P073361 TF-57258 Closed USD 8.50 6.49 2.01 6.49 0.00 100.00 Disbursement Graph Page 10 of 11

Key Decisions Regarding Implementation Following the successful completion of all the activities under the original project on June 29, 2012, the client is currently implementing the post-disaster reconstruction activities under the additional financing. The additional financing is expected to close on time by December 31, 2013. The achievement of PDO has been downgraded from satisfactory to moderately satisfactory because among the three key project outcome indicators, only two have been achieved. The outcome indicator increase the efficiency of post-disaster recovery and reconstruction efforts has been only partially achieved as there has no substantial speed procedure been established for post-disaster reconstruction, considering the project closing date is on December 31, 2013. Restructuring History Level two Approved on 24-May-2010, Level two Approved on 19-Jul-2011, Level two Approved on 27-Dec-2011, Level two Approved on 31-May-2012 Related Projects P119684-VN- Natural Disaster Risk Management Project - Additional Finance Page 11 of 11